My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12486
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12486
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:19 PM
Creation date
7/24/2007 11:03:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8221.109
Description
Colorado River Basin Projects - Long Hollow
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/1/2004
Author
Wright Water Engineers
Title
Long Hollow Dam and Reservoir - Phase I Summary Report - Preliminary Drafts - (no final) 05-01-04 through 06-01-04
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001715 <br /> <br />Long Hollow Dam and Reservoir Summary Report-Preliminary Draft <br /> <br />Releases from storage will be made in cooperation with the Colorado Division of Water <br />Resources (CDWR), according to andraft MOD and operations plan between LPWCD and <br />CDWR. (Need some indication that CDWR is in agreement with draft MOD concepts and can <br />meet their obligations.) <br /> <br />Also, need a list of ditches that benefit (is this the CDWR tabulation for the mainstem La Plata?) <br />and the number of share HOLDERS in each ditch. <br /> <br />8.2 Payment Issues <br /> <br />It is anticipated that funding for design and construction of LHR will be requested from the <br />Future Projects Escrow Account held by the Colorado Water Resources and Power Development <br />Authority (Authority), as outlined in the Future Projects Escrow Agreement between the <br />Authority, the Animas-La Plata Water Conservancy District (ALPD), and LPWCD. <br /> <br />The operation, maintenance, and repair (OM&R) expenses for LHR will be borne by the <br />LPWCD water users. Ditches that benefit from the exchange program will be assessed an annual <br />fee of approximately $15 per AF by LPWCD based on review of the OM&R expenditures for <br />existing Red Mesa Ward Reservoir. <br /> <br />Need a section that discusses the financial condition of the LPWCD to help evaluate the ability <br />of the LPWCD to undertake the additional responsibility. Does the $15\AF raise enough <br />additional money to allow the LPWCD to undertake the OM&R responsibility? Do the <br />beneficiaries have the ability to absorb what appears to be a rather modest fee? What is the <br />potential range of cost to the beneficiaries? Will the potential beneficiaries sign UP for the water? <br />CWCB has a fairly standard list of questions to address in this respect which are outlined in the <br />attached documents. <br /> <br />8.3 Local Consultations (Need a short description of the consultation results. <br />general support and or general concerns) <br /> <br />Local consultations during the Phase I study process included: <br /> <br />991-077.115 <br />May 2004 <br /> <br />Wright Water Engineers, Inc. <br /> <br />Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.