My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10377 (4)
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10377 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:41:14 PM
Creation date
7/23/2007 2:03:24 PM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Fort Collins
Stream Name
Cache La Poudre River
Title
Volume II - Hydraulic Analysis for the Cache La Poudre River between Timnath Diversion Dam and College Ave. - Appedix G.4
Date
4/11/2006
Prepared For
Fort Collins
Prepared By
Anderson Consulting Engineers, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXIOOQ06.0H2 <br /> <br />DIVIDED FLOW PATH WILL RETURN TO THE MAIN CHANNEL UPSTREAM OF THE <br />MULBERRY BRIDGE. THIS PROVIDES A MORE AUTOMATED AND CONSERVATIVE <br />MODEL. <br />5. DELETED ALL OF THE 500-YEAR DISCHARGE INPUT FROM ALL QT CARDS FROM THE <br />EFFECTIVE LOWER Q 100-, 50-, AND 10-YEAR FLOODPLAIN MODEL (LOWQ99.DAT) <br />SINCE 500-YEAR WATER SURFACE ELEVATIONS WERE NOT COMPUTED UTILIZING; <br />THIS CORRECTED EFFECTIVE MODEL. <br />6. TRUNCATED THE LEFT OVERBANK GEOMETRY FROM THE GEOMETRY DATA OF II <br />CROSS SECTIONS 228117, 229322, AND 229477 DUE TO THESE AREAS <br />NOT BEING HYDRAULICALLY CONNECTED TO THE MAIN CHANNEL. <br />**********************************************************w***********i* <br /> <br />************************************************************************ <br />I <br />;~; *;~~~~;~~~ * ~;;;,;;; * ;;; *~; * ~;;~~~ * ;~; *; ~~; * ;~~~;;, * ~~;~~~ * *** * ** * i * <br />~R. 1 <br />************************************************************************ <br /> <br />. <br /> <br />FILE: RCUPR05.DAT <br />THIS 2005 REMOVAL ACTION LOMR REVISED CONDITION MODEL: <br />9. INCORPORATES AS-BUILT TOPOGRAPHY FOR THE REMOVAL ACTION <br />SITE THE 1-FT AS-BUILT TOPOGRAPHY FOR THE REMOVAL ACTION <br />SITE WAS DEVELOPED FROM POST-PROJECT LAND SURVEYS CONDUCTED BY <br />BY NORTHERN ENGINEERING IN JUNE 2005. GEOMETRY FOR THE <br />FOLLOWING CROSS SECTIONS WERE UPDATED UTILIZING THE AS- <br />BUILT SURVEY TOPOGRAPHY WERE APPROPRIATE; 229322, 229477, 1 <br />AND 229757. I <br />**********************************************************************j* <br /> <br />************************************************************************ <br /> <br />i <br />, <br /> <br />FILE: CEUPR05.DAT <br />THIS 2005 REMOVAL ACTION LOMR CORRECTED EFFECTIVE MODEL: <br />1. IS BASED ON THE REVISED CONDITION MODEL UPPER-RC.DAT <br />FROM THE POWER PLANT DROP STRUCTURE/BOAT CHUTE LOMR <br />CONDUCTED IN 2001. THE 2001 POWER PLANT DROP STRUCTURE/BOAT CHUTE <br />LOMR REVISED THE 1994 UPPER.DAT FEMA MODEL BY ADDING TWO CROSS <br />SECTIONS (230193 AND 230355) TO REFLECT THE NEW GRADING ASSOCIATED <br />WITH THE DROP STRUCTURE. <br />2. COMPUTES 100-, 50-, AND 10-YEAR WATER SURFACE PROFILES FOR THE <br />MAIN CHANNEL. DISCHARGES UTILIZED TO COMPUTE THE WATER SURFACE <br />PROFILES ARE BASED ON THE SPLIT FLOW DISCHARGES DETERMINED FROM <br />THE 1994 UPPERQ.DAT MODEL. <br /> <br />09MARO 6 <br /> <br />15:41:12 <br /> <br />PAGE <br /> <br />I <br />I <br />I <br />1 <br /> <br />***********************************************************************j <br /> <br />***********************************************************************f <br /> <br />;;;*;~~~~;;;~*~;;;~;;*;;;;*~;*~~;;~~*;;;*;~~~*;~:;;*;~;*~;~;********I <br /> <br />STRUCTURE/BOAT CHUTE LOMR <br /> <br />~~*~~~~*~~g~~:~;~~~~~~*~~~;i:~:~~~~~~:~~~*~~~~~~:;g~*:::::******\ <br /> <br />SECTION 230355. <br />***********************************************************************1 <br /> <br />************************************************************************ <br />, <br />;;; * ;~~~~:;~~ * ~;;;,~;; *;;;; *~; * ~~;;~~ * ;;; * ~ ;;; * ;;~;;~;~; * ;~;; * * * * * * * * *1 <br /> <br />LOMR. <br />************************************************************************1 <br />FILE: LOWQ99.DAT <br />THIS 1999 LOMR MODEL: I <br />1. IS BASED ON THE 1997 LOWQ97R.DAT MODEL. <br />2. INCORPORATES AS-BLT SURVEY DATA BETWEEN X-SEC.S 212317 THRU 216105 I <br /> <br />P:\COFC2003\1O - Oxbow Levee\LOMR\FinDisk (Final)\Appendix G\FEMA Mod~ls\Existing Models\EXIOOQ06.doc <br /> <br />3. CHANGED THE STARTING WATER SURFACE ELEVATIONS FOR ALL PROFILES I <br />TO MATCH THE OUTPUT OF THE EFFECTIVE LOWER 100-, 50-, AND 10-YEAR ' <br />FLOODPLAIN MODEL FROM THE 1999 TIMBERLINE ROAD LOMR LOMR (LOWQ99.DAT,). <br />4. INCORPORATES UPDATED PRE-PROJECT TOPOGRAPHY BETWEEN THE <br />DOWNSTREAM SIDE OF LINDEN STREET, CROSS SECTION 228637, AND JUST <br />DOWNSTREAM OF THE B.N.R.R., CROSS SECTION 229997. TWO SETS OF <br />TOPOGRAPHY WERE UTILIZED TO UPDATE THE HYDRAULIC MODEL. 1-FT PRE- <br />PROJECT TOPOGRAPHY FOR THE REMOVAL ACTION SITE WAS DEVELOPED FROM <br />LAND SURVEYS CONDUCTED BY NORTHERN ENGINEERING IN 2004. PRE-PROJECT <br />TOPOGRAPHY FOR PORTIONS OF THE LEFT OVERBANK THAT WERE NOT <br />INCLUDED IN THE TOPOGRAPHY DEVELOPED FOR THE REMOVAL ACTION SITE <br />WERE OBTAINED FROM THE COFC. THE COFC 2-FT TOPOGRAPHY WAS DEVELOPED <br />FROM AERIAL PHOTOS TAKEN IN 1999. GEOMETRY FOR THE FOLLOWING <br />EFFECTIVE CROSS SECTIONS WERE UPDATED UTILIZING THE PRE-PROJECT <br />TOPOGRAPHY; 228637, 228687, AND 229477. WHILE UPDATING THE <br />GEOMETRY FOR CROSS SECTION 229477 IT WAS DECIDED TO SHORTEN THE <br />GR DATA FOR THE RIGHT OVERBANK. THUS, CROSS SECTION 229477 <br />WAS SHORTENED BY APPROXIMATELY 800 FEET. <br />5. INCLUDES THE ADDITION OF TWO CROSS SECTIONS AT THE DOWNSTREAM <br />(229322) AND-THE .UPSTREAM- (229757) ENDS OF THE REMOVAL ACTION <br />PROJECT SITE. PRE-PROJECT TOPOGRAPHY WAS UTILIZED TO DEVELOP THE <br />GEOMETRY FOR CROSS SECTIONS 229322 AND 229757. <br />6. CHANGED THE X3 CARD FOR CROSS SECTION 229477 INTO AN ET CARD AND <br />ADJUSTED THE LEFT ENCROACHMENT STATION OF 6770 ON THE X3 CARD TO <br />STATION 7165 ON THE ET CARD TO REPRESENT THE INEFFECTIVE FLOW IN <br />THE LEFT OVERBANK CAUSED BY BUILDINGS UNDER CONSTRUCTION IN THE <br />EFFECTIVE CONDITION PHOTO (IMPACTS 500-YEAR FLOWS ONLY). <br />7. CHANGED THE LEFT ENCROACHMENT STATION OF THE X3 CARD FOR CROSS <br />SECTION 229997 FROM STATION 8170 TO STATION 8170.1 SO THAT <br />THE ENCROACHMENT STATION WOULD LIE WITHIN THE GEOMETRY DATA. <br />8. HAS A -1 INSERTED INTO FIELD 7 OF THE J2 CARD TO COMPUTE <br />CRITICAL DEPTH AT ALL CROSS SECTIONS. <br /> <br />. <br /> <br />. <br /> <br />Page 2 of 49 <br /> <br />Created on 3/9/2006 3:42 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.