My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10378 (2)
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:15:26 AM
Creation date
7/20/2007 10:30:00 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Arapahoe
Denver
Stream Name
South Platte River
Title
UDFCD South Platte River Program - 1996 Routine Maintenance Contract Documents - Contract Nu. 95-11.07
Date
1/1/1996
Prepared By
Urban Drainage
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />5. MEASUREMENT AND PAYMENT <br /> <br />'. <br /> <br />A. Lump Sum CHANGE ORDERS <br /> <br />. <br /> <br />If the CONTRACTOR is to be compensated for any extra work on a Lump Sum <br />basis the cost of that work will be negotiated between DISTRICT and <br />CONTRACTOR, agreed upon and documented by a CHANGE ORDER before any <br />work is begun. <br /> <br />The cost ofa Lump Sum shall not be increased or decreased unless the scope of the <br />work is changed by DISTRICT after the Lump Sum price has been established. <br /> <br />. <br /> <br />B. Unit Price CHANGE ORDERS <br /> <br />. <br /> <br />If the CONTRACTOR is to be compensated for a CHANGE ORDER on a unit price <br />basis for additional units on an existing work item, the unit cost will be the same as <br />the price for that item on the unit price schedule. If the CONTRACTOR is to be <br />compensated for a CHANGE ORDER on a unit price basis for a new work item, the <br />cost of each unit designation will be negotiated between the DISTRICT and the <br />CONTRACTOR, agreed upon and documented by a CHANGE ORDER before any <br />work is begun. <br /> <br />. <br /> <br />If payment for the major part of the work done under the contract is based on <br />specially identified units of maintenance rather than on a lump sum price, the <br />contract will be known as a unit price contract. In the case of the unit price contract, <br />the number of units of specific type as set forth in the proposal may vary from the <br />number of units actually measured when the work has been completed. Should the <br />completed number of units of anyone unit designation vary by more than 25 percent <br />from the number originally stated in the proposal for that designation and should this <br />difference in number of completed units change the total contract value as originally <br />bid by more than ten percent, the CONTRACTOR or the DISTRICT may request <br />that the unit price of that particular unit designation be renegotiated. <br /> <br />. <br /> <br />. <br /> <br />C. <br /> <br />Time and Materials CHANGE ORDERS <br /> <br />. <br /> <br />If the CONTRACTOR is to be paid for any extra work on a Time and Materials basis <br />his compensation shall be the sum of the following: <br /> <br />. <br /> <br />1. labor costs as shown on the attached wage rate schedule and; <br />2. charges for the use of equipment as shown on the attached equipment rate <br />schedule and; <br />3. the actual cost plus 15% of materials delivered to, and used, on the project, <br />including transportation charges paid by him. <br />4. dump fee tickets <br /> <br />. <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.