Laserfiche WebLink
<br />2 <br /> <br />The following table is a partial listing of existing and modified BFEs: <br /> <br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet) * <br /> <br />Approximately 50 feet downstream of Raleigh Street <br />Approximately 350 feet upstream of West 99th Place <br /> <br />5,433 <br />5,449 <br /> <br />5,434 <br />5,450 <br /> <br />*Referenced to the National Geodetic Vertical Datum, rounded to the nearest whole foot <br /> <br />Public notification of the proposed modified BFEs will be given in the Westminster Window on or about <br />May 20 and May 27, 1999. A copy of this notification is enclosed. In addition, a notice of changes will <br />be published in the Federal Register. Within 90 days of the second publication in the Westminster Window, <br />a citizen may request that FEMA reconsider the determination made by this LOMR. Any request for <br />reconsideration must be based on scientific or technical data. All interested parties are on notice that, until <br />the 90-day period elapses, the determination to modify the BFEs presented in this LOMR may itself be <br />modified. <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents and <br />mortgage lenders, your community will serve as a repository for these new data. We encourage you to <br />disseminate the information reflected by this LOMR throughout the community, so that interested persons, <br />such as property owners, local insurance agents, and mortgage lenders, may benefit from the information. <br />We also encourage you to prepare a related article for publication in your community's local newspaper. <br />This article should describe the assistance that officials of your community will give to interested persons <br />by providing these data and interpreting the NFIP maps. <br /> <br />We will not physically revise and republish the FIRM and FIS report for your community to reflect the <br />modifications made by this LOMR at this time. When changes to the previously cited FIRM panel(s) and <br />FIS report warrant physical revision and republication in the future, we will incorporate the modifications <br />made by this LOMR at that time. <br /> <br />The floodway is provided to your community as a tool to regulate floodplain development. Therefore, the <br />floodway modifications described in this LOMR, while acceptable to FEMA, must also be acceptable to <br />your community and adopted by appropriate community action, as specified in Paragraph 6O.3(d) of the <br />NFIP regulations. <br /> <br />This LOMR is based on minimum floodplain management criteria established under the NFIP. Your <br />community is responsible for approving all floodplain development, and for ensuring all necessary permits <br />required by Federal or State law have been received. State, county, and community officials, based on <br />knowledge of local conditions and in the interest of safety, may set higher standards for construction in the <br />SFHA. If the State, county, or community has adopted more restrictive or comprehensive floodplain <br />management criteria, these criteria take precedence over the minimum NFIP criteria. <br /> <br />This determination has been made pursuant to Section 206 of the Flood Disaster Protection Act of 1973 <br />(Public Law 93-234) and is in accordance with the National Flood Insurance Act of 1968, as amended <br />(Title XIII of the Housing and Urban Development Act of 1968, Public Law 90-448), <br />42 U.S.C. 4001-4128, and 44 CFR Part 65. Pursuant to Section 1361 of the National Flood Insurance Act <br />of 1968, as amended, communities participating in the NFIP are required to adopt and enforce floodplain <br />management regulations that meet or exceed minimum NFIP criteria. These criteria are the minimum and <br />