Laserfiche WebLink
<br />r-C .' { . <br /> <br />(. <br /> <br />(e <br /> <br />point designated for each structure. Before starting to create the G.I.S. for all the <br />structures, the information for 1 structure will be finalized and agreed. <br />i. Database fields <br />i. Structure name <br />ii. Structure location (coordinate and latitude I longitude) <br />iii. Contacts and telephone number <br />iv. Access directions <br />v. Structure condition <br />vi. Other data that is agreed to before starting to create the database. <br />This may include information regarding future inspections, <br />contacts with structure owners, loan applications. <br />j. PDF file <br />i. Photographs <br />ii. Field observation report <br />iii. Field sketches <br />iv. Repair plan <br />k. Training - the G.I.S. data will be provided for CWCB staff to install on their <br />computers. Before creating the G.I.S. links, CWCB will provide Olsson <br />Associates with the directory structure that will be used for the G.I.S. One <br />4-hour training session will be provided to CWCD staff. <br />Complete by June 30, 2006 <br /> <br />To prepare the project scope and fee estimate, we have assumed that the Colorado <br />Water Conservation Board will provide: <br /> <br />. Structure Inventory Report, prepared by NRCS, for Upper Colorado River Basin. <br />. Existing structure inventory information prepared by Davie Engineering along the <br />Rio Grande River. <br />. All existing structure information held by the NRCS Monte Vista Office for the Rio <br />Grande River. <br />. All existing structure information held by the State Engineer's Office, Division 3. <br /> <br />Olsson Associates <br /> <br />April 2006 <br />