<br />...' <br />, <br /> <br />._f : <br /> <br />, . <br /> <br />(. <br /> <br />- <br /> <br />Scope of Services/Proposal <br />Rio Grande/Upper Colorado River Diversion Structure Inventory <br />Divisions 3 and 5 <br /> <br />Evaluate the hydraulic and structural condition of raw water diversion structures along <br />the main stem of the Rio Grande River from the City of South Fork to the state line, and <br />along Roaring Fork, Crystal, and Colorado Rivers, as identified in Natural Resource <br />Conservation Services (NRCS) inventory report, as provided. 30 diversion structures <br />are estimated to exist along the Rio Grande River and 27 structures have been identified <br />by NRCS along the Roaring Fork, Crystal, and Colorado Rivers. The structures <br />identified by NRCS are all in poor conditions and in need of replacement. Structures in <br />good to fair condition along these reaches were not evaluates by NRCS. The number of <br />structures along the Rio Grande River may vary, based on further field investigation. <br /> <br />The extent of evaluation that will occur along the Upper Colorado River Basin is <br />contingent upon the number of structures encountered along the Rio Grande River. <br />The consultant will complete the Rio Grande River section first and then will determine <br />the remaining funds available to complete the Upper Colorado River Basin. <br /> <br />1) Research and planning - Complete by May 1,2006 <br />a) Review data provided by CWCB. <br />b) Plot the location of structures on USGS quad sheets and plan access routes. <br />2) Participate in a public meeting, to be held in the City of Alamosa, informing the <br />public, ditch companies, districts, and surrounding communities of the intent of the <br />project, and the time and locations when the information will be collected, and to <br />additionally obtain any helpful information towards the development of the project. <br />This meeting is tentatively scheduled to be held the last week of April 2006. <br />3) Field inventory - visit each project site to make measurements, note structure <br />condition and take pictures. Tasks will include: <br />a) Field observation <br />b) Measure and sketch <br />c) Photographs <br />d) Notes regarding condition of the structure and needed repairs <br />Complete by May 15, 2006. <br />4) Report - prepare a report summarizing procedure and work effort. Prepare <br />conceptual repair plan and conceptual level opinion of probable cost for each <br />structure. The repair plan may be in narrative and/or graphic form. The report will <br />include: <br />a. Narrative describing inventory process <br />b. Location map <br />c. One-page summary for each structure <br />d. Structure field sketches <br />e. Photo log <br />f. Observation report <br />g. Conceptual repair plan (narrative and/or graphic) <br />h. Conceptual level opinion of probable cost to repair or replace <br />Complete by June 1, 2006 <br />5) Geographic Information System (G.I.S.) - The data collected for each structure will <br />be entered into GIS using ARCView. The base maps used for the GIS will be from <br />public domain data that is readily available from the internet. The GIS database will <br />include data for each structure and an Adobe Acrobat PDF file the will be linked to the <br /> <br />Olsson Associates <br /> <br />April 2006 <br />