Laserfiche WebLink
<br />.' <br />.' <br /> <br />r"~ <br />It <br /> <br />." <br /> <br />b) PDF file <br />i) Photographs <br />ii) Field observation report <br />iii) Field sketches <br />iv) Repair plan <br />c) Training - the G.I.S. data will be provided for CWCB staff to iAstall on their <br />computers. Before creating the G.I.S. links, CWCB will provide Olsson and <br />Associates with the directory structure that will be used for the G.I.S. One 2-hour <br />training session will be provided to CWCD staff. <br />Complete by June 30, 2005 <br /> <br />To prepare the project scope and fee estimate, we have assumed that the Colorado <br />Water Conservation Board will provide: <br />1 . Structure locations <br />2. Local contact name and telephone number. <br /> <br />These 2 items are currently being obtained from the State Engineer's, Division 2 Office. <br />It is not known to what extent the above information is available. <br />