Laserfiche WebLink
<br />e\ <br /> <br />.' <br /> <br />i) Photographs <br />ii) Field observation report <br />iii) Field sketches <br />iv) Repair plan <br />c) Training - the G.I.S. data will be provided for CWCB staff to install on their <br />computers. Before creating the G.I.S. links, ewcs will provide Farnsworth with <br />the directory structure that will be used for the G.I.S. One 4-hour training session <br />will be provided to CWCD staff. <br />Complete by June 3D, 2004 <br /> <br />To prepare the project scope and fee estimate, we have assumed that the Colorado <br />Water Conservation Board will provide: <br />1. Structure location and access map <br />2. Permission across private property to access the structures <br />3. Local contact name and telephone number <br />4. Initial condition report and pictures of the structures <br />5. Ownership <br />6. Decreed water rights <br /> <br />The final report prepared for the Lower Arkansas by the consultant will be <br />consistent with the reports completed for the South Platte, for Divisions 1, 2 and <br />64. <br /> <br />Farnsworth Group, Inc <br /> <br />March 2004 <br />