My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02142
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 10:23:46 AM
Creation date
7/17/2007 1:02:16 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150023
Contractor Name
Ryan Gulch Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
SB 99-173
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..r ~ <br /> <br />r <br /> <br />5. Please indicate: The number of shareholders: <br />or <br />The number of customers: <br /> <br />10 <br /> <br />6. What is the purpose of this project? Check one: <br />_ New project <br />---.XX. Rehabilitation or replacement of existing facility <br />_ Enlargement of existing facility <br />_ Emergency repair <br />_ Other (please describe) <br /> <br />7. If the project is for rehabilitation of an existing dam, is the dam currently under a <br />restriction by the State Engineer? yes <br /> <br />8. General location of the proposed project. Include county and approximate distance and <br />direction from the nearest town or city: Larimer County, Loveland, Colorado <br />See Map #1 and Photo #2 <br /> <br />9. Please provide a brief narrative description of the proposed project including purpose, <br />facilities, types of water use to be served, and service area (if known at this time). Attach <br />additional pages, maps, or drawings as needed. <br />The original spillway is inadequate to meet flood requirements. An enlarged <br />and improved spillway is required to lift State Engineer restrictions. <br /> <br />10. Please list any preliminary analyses or investigations which have been done or are in <br />progress for the proposed project along with the names of the persons or firms who prepared <br />the analyses: Ryan Gulch Dam Hydrologic Assessment by Ed A. Toms, P.E. <br /> <br />11. If preliminary cost estimates have been made, indicate the estimated cost of the project:_ <br />Feasibility study by Ed Toms, - $10,900.00 <br /> <br />12. Are you intending to apply for a feasibility study loan from the CWCB Construction <br />Fund? <br /> <br />YP.R <br /> <br /> <br />Tl1np l?, lqqR <br />Date <br /> <br />l:\wctrans\secb\preapp.mis <br />
The URL can be used to link to this page
Your browser does not support the video tag.