Laserfiche WebLink
<br />c',., <br /> <br />." <br /> <br />c.- .' <br />r <br /> <br />Colorndo Water ConselVauon Boanl <br />Pre-Application Form for Construction Fund Loan <br /> <br />This form is intended for pre-application purposes to provide the Colorado Water <br />Conservation Board (CWCB) staff with preliminary information regarding a proposed water <br />project and the project sponsor. This form,may also be used to apply for a feasibility study <br />loan from the CWCB, <br /> <br />When completing this pre-application, please type or print with black ink. You may attach <br />additional pages, maps, drawings, etc. which you feel would be helpful in describing your <br />project or explaining your water supply problem. If you have questions about this form or <br />about the application process please call the Project Planning and Construction Section of the <br />CWCB at 303-866-3441. <br /> <br />Information regarding Construction Fund loans and the loan application and funding proc~ss <br />can be found ip. the Guidelines for Financial A ssistance through the Colorado Water <br />ConselVation Board Construction Fund copies of which are available by calling the CWCB. <br /> <br />Generally, the loan applicant is also the prospective owner or sponsor of the project. If this is <br />not the case, please provide an explanation with this pre-application form. <br /> <br />1. Name and address of applicant: <br />Rvan Gulch Reservoir Company <br />PO Box 299 <br />Loveland CO 80539-0299 <br /> <br />Telephone number (970) 667-2680 Fax Number ( 970 ) 667-0036 <br /> <br />2. Person to contact regarding this application: <br />Name: Harold O. Kester <br />Positionffitle: Presiden t <br />Mailing address: PO Box 299 <br />Loveland CO 80539-0299 <br />Telephone number ( 970) 667-2680 Fax Number ( Q70 ) nn7 ()(nn <br /> <br />3. Type of organization (ditch company, irrigation district, municipality, special district, <br />private owner, etc.): reservoir company <br /> <br />4. Please provide a brief description of existing water supply facilities and describe any <br />existing operational or maintenance problems. Attach separate sheets and a map if needed: <br />Dam and reservoir -- the spillway is inadequate <br /> <br />/ <br />