Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $127,500. <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />$ 10,000 <br />$117,500 <br /> <br />$127,500 <br /> <br />Total Cost <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Recharge Well <br />2. 15" Pipeline (3500 LF) <br />3. Excavation of Ponds <br />4. Road Crossings <br />5. Culverts <br />6. Measuring Devices <br />7. Jackson Lake Share <br />9. Contingency <br />8. Planning and Design Costs <br /> <br />$ 39,000 <br />$ 27,000 <br />$ 6,000 <br />$ 2,000 <br />$ 500 <br />$ 14,000 <br />$ 20,000 <br />$ 9,000 <br />$ 10,000 <br /> <br />$127,500 <br /> <br />Total Cost <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />~Comp1ete Final Design <br />2. Start Construction <br />3. Complete Construction <br />4. Project is Operational <br /> <br />Date <br />03/22/04 <br />03/29/04 <br />04/09/04 <br />04/10104 <br /> <br />,easibility Study <br />,L Gill H20 LLC Aug Project <br />,ebruary 2003 <br /> <br />6 <br />