Laserfiche WebLink
<br />I <br /> <br />I <br /> <br /> <br />. ]obNo:98.224 <br />01/18/00 <br /> <br />Prepareclby:CMAlJFM <br />altemat!:2;x1s <br /> <br />I <br /> <br />I <br /> <br /> <br /> NUMBER UNIT UNIT ESTIMATED <br />DESCRIPTION OF UNITS TYPE COST COST <br />PERMITTING <br />Stormwater Discharge Permit LS $1,200.00 $1,200.00 <br />Air Emissions Permit LS $800.00 $800.00 <br />404 Clean Water Act Permitting LS $20,000.00 $20,000.00 <br />Grading Permit LS $1,000.00 $1,000.00 <br />CDOT Crossing Agreement LS $2,500.00 $2,500.00 <br />UPRR Crossing Agreement LS $3,000.00 $3,000.00 <br />SUBTOTAL $28,500.00 <br />PETERSON DITCH DIVERSION STRUCTURE <br />Diversion Structure with Gates I LS $35,000.00 $35,000.00 <br />Reservoir feeder pipe from diversion structure 2,190 LF $150.00 $328,500.00 <br />Inlet structure into reservoir I LS $30,000.00 $30,000.00 <br />SUBTOTAL $393,500.00 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />RESERVOIR <br />Construction Dewatering Trench <br />Reservoir Embankment <br />Outlet Structure (Including Control Gate) <br />Outlet Channel to South Platte <br />Keyway (approximate) <br />Spillway <br />Liner Preparation of Bottom <br />Toe Drain <br /> <br />I <br /> <br />SUBTOTAL <br /> <br />15,000 LF $2.00 $30,000.00 <br />1,328,516 CY $1.60 $2,125,625.60 <br />I LS $45,000.00 $45,000.00 <br />5,000 LF $5.00 $25,000.00 <br />42,000 CY $1.60 $67,200.00 <br />I LS $15,000.00 $15,000.00 <br />280 ACRE $300.00 $84,000.00 <br />15,000 LF $9.50 $142,500.00 <br /> $2,534,325.60 <br /> <br />I <br /> <br />I <br /> <br />LAND ACQUISITION <br />Pasture <br /> <br />350 <br /> <br />AC <br /> <br />$200.00 <br /> <br />$70,000.00 <br />$70,000.00 <br /> <br />SUBTOTAL <br /> <br />I <br /> <br />I <br /> <br />TOTAL ESTIMATED CONSTRUCTION COST <br />Contingencies @ 20% <br />Engineering Design <br />Legal and Administration <br />Construction Staking <br />Construction Observation <br />Quality Control Testing <br /> <br />$3,026,325.60 <br />$605,265 <br />$121,053 <br />$90,790 <br />$15,000 <br />$40,000 <br />$25,000 <br /> <br />I <br /> <br />I <br /> <br />TOTAL ESTIMATED PROJECT COST <br /> <br />$3,923,434 <br /> <br />Cost on a per-acre foot basis <br /> <br />$679.74 <br /> <br />I <br /> <br />I <br />