My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02106
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 10:05:51 AM
Creation date
7/17/2007 8:52:16 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0063FX
Contractor Name
Groundwater Appropriators of the South Platte
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />Tuttle Applegate, Inc. <br /> <br />Job No.: 98-224 <br />01118/00 <br />Prepared by: CMAlJFM <br />alternate Lxls <br /> <br />I <br /> <br />GASP RESERVOIR:OVID SITE <br />Preliminary Opinion of Probable Cost <br />AL.TERNATE I~ 3,978 acre-footcapacity <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />RESERVOIR <br />Construction Dewatering Trench <br />Reservoir Embankment <br />Outlet Structure (Including Control Gate) <br />Outlet Channel to South Platte <br />Keyway (approximate) <br />Spillway <br />Compaction of reservoir bottom as a liner <br />Toe Drain <br /> <br />I <br /> <br />SUBTOTAL <br /> <br />15,000 LF $2.00 $30,000.00 <br />748,009 CY $1.20 $897,610.80 <br />I LS $45,000.00 $45,000.00 <br />5,000 LF $7.00 $35,000.00 <br />42,000 CY $1.20 $50,400.00 <br />I LS $15,000.00 $15,000.00 <br />280 ACRE $300.00 $84,000.00 <br />15,000 LF $9.50 $142,500.00 <br /> $1,299,510.80 <br /> <br />I <br /> <br />I <br /> <br />LAND ACQUISITION <br />Pasture <br /> <br />350 <br /> <br />AC <br /> <br />$200.00 <br /> <br />$70,000.00 <br />$70,000.00 <br /> <br />SUBTOTAL <br /> <br />I <br /> <br />I <br /> <br />TOTAL ESTIMATED CONSTRUCTION COST <br /> <br />Contingencies @ 20% <br />Engineering Design <br />Legal and Administration <br />Construction Staking <br />Construction Observation <br />Quality Control Testing <br /> <br />$1,791,511 <br />$358,302 <br />$98,533 <br />$53,745 <br />$15,000 <br />$35,000 <br />$25,000 <br /> <br />I <br /> <br />I <br /> <br />TOTAL ESTIMATED PROJECT COST <br /> <br />$2,377,091 <br /> <br />Cost on a per-acre foot basis <br /> <br />$597.56 <br /> <br />I <br /> <br />I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.