Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />Tuttle Applegate, Inc. <br /> <br />Job No.: 98-224 <br />01118/00 <br />Prepared by: CMAlJFM <br />alternate Lxls <br /> <br />I <br /> <br />GASP RESERVOIR:OVID SITE <br />Preliminary Opinion of Probable Cost <br />AL.TERNATE I~ 3,978 acre-footcapacity <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />RESERVOIR <br />Construction Dewatering Trench <br />Reservoir Embankment <br />Outlet Structure (Including Control Gate) <br />Outlet Channel to South Platte <br />Keyway (approximate) <br />Spillway <br />Compaction of reservoir bottom as a liner <br />Toe Drain <br /> <br />I <br /> <br />SUBTOTAL <br /> <br />15,000 LF $2.00 $30,000.00 <br />748,009 CY $1.20 $897,610.80 <br />I LS $45,000.00 $45,000.00 <br />5,000 LF $7.00 $35,000.00 <br />42,000 CY $1.20 $50,400.00 <br />I LS $15,000.00 $15,000.00 <br />280 ACRE $300.00 $84,000.00 <br />15,000 LF $9.50 $142,500.00 <br /> $1,299,510.80 <br /> <br />I <br /> <br />I <br /> <br />LAND ACQUISITION <br />Pasture <br /> <br />350 <br /> <br />AC <br /> <br />$200.00 <br /> <br />$70,000.00 <br />$70,000.00 <br /> <br />SUBTOTAL <br /> <br />I <br /> <br />I <br /> <br />TOTAL ESTIMATED CONSTRUCTION COST <br /> <br />Contingencies @ 20% <br />Engineering Design <br />Legal and Administration <br />Construction Staking <br />Construction Observation <br />Quality Control Testing <br /> <br />$1,791,511 <br />$358,302 <br />$98,533 <br />$53,745 <br />$15,000 <br />$35,000 <br />$25,000 <br /> <br />I <br /> <br />I <br /> <br />TOTAL ESTIMATED PROJECT COST <br /> <br />$2,377,091 <br /> <br />Cost on a per-acre foot basis <br /> <br />$597.56 <br /> <br />I <br /> <br />I <br /> <br />