My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02105
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:27 AM
Creation date
7/17/2007 7:50:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0065FX
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Acknowledgments <br /> <br />Boyle Engineering Corporation would like to thank the Greeley and Loveland Irrigation <br />Company for their valuable assistance during the preparation of this report. Special thanks are <br />offered to Messrs. Ron Brinkman and David Bernhardt, Greeley and Loveland Irrigation Company; <br />Mr. John Gauthiere, Gauthiere Engineering; Mr. Tom Donkle, City of Greeley; Mr. Mark Haynes, <br />State Engineer's Office (SED); and Mr. Mike Serlet, Colorado Water Conservation Board (CWCB) <br />for their time and efforts on this project. <br /> <br />The following lists Boyle's team members for the project: <br /> <br />Ed A. Toms, P.E. <br /> <br />Project Manager <br /> <br />Darren Brinker, P.E. <br /> <br />Civil/Hydraulic Engineer / Technical Leader <br /> <br />Boyd Lake Dam Outlet System Feasibility Study <br /> <br />11 <br /> <br />1f30VLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.