Laserfiche WebLink
<br />CONSOLIDATED <br />CONSULTING <br />SERVICES <br /> <br />ReCEIVED <br /> <br />FE8 0 3 1995 <br />CoI~doW. <br />conaef'Vati lItor <br />on l3o~d <br /> <br />CIVIL ENGINEERING <br />303874-5342 <br />303872-2461 <br /> <br />LAND SURVEYING <br />303 835-3953 <br /> <br />January 27, 1995 <br /> <br />Mr. William Green <br />Colorado Water Conservation Board <br />1313 Sherman Street Room 721 <br />Denver Colorado 80203 <br /> <br />RE: Reservoir Renovations for Leroux Creek Water Association <br /> <br />Dear Mr. Green: <br /> <br />The Associaton has received your letter informing them that a loan request for <br />renovation of reservoirs was included in your request to the Legislature for <br />1995. We appreciate your accepting the application. We completed the field <br />investigations of the Lost Hunter and Sheepsdrive Reservoir sites and developed <br />tables of earthwork quantities and storage capacities for each site and are in <br />the process of preparing the Reconnaissance Report for each of those sites. We <br />recently discussed our findings with the Association and have already determined <br />that neither of those sites is appropriate for construction assistance from your <br />loan program. The Association hopes to do a small project on the Sheepsdrive <br />which should cost less than $40,000. They prefer to fund that project on their <br />own based on your group's suggestion that Board money is inappropriate for <br />projects of this size. The Lost Hunter project has been found to be too cost <br />prohibitive for the shareholders at this time. We are working with the US Forest <br />Service and the State Engineer on the Sheepsdrive project and hope to make those <br />improvements during the 1995 construction season. <br /> <br />The Association has requested that <br />their loan request for one year. <br />examine other potential sites for <br />summer and hopefully find a site <br />store additional water. <br /> <br />we notify you that they would like to postpone <br />The Association, working with us, hopes to <br />reservoir renovation and/or enlargement next <br />which would provide a cost effective way to <br /> <br />We appreciate your working with the Association in processing their loan <br />application quickly last fall and apologize for any inconvenience our request <br />to postpone the process one year has caused. If you have any questions or need <br />further information, please feel free to contact me at 303 874 5342 or Tom Alvey, <br />President of LeRoux Creek. Thank you for your assistance. <br /> <br />Sincerely, <br /> <br />~ne@ <br /> <br />cc: LeRoux Creek Water Users Association <br /> <br />P.O. BOX 738 · DELTA, COLORAOO 81416 <br />