My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-052 Feasibility Study 2
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
CT2015-052 Feasibility Study 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 9:54:07 AM
Creation date
7/13/2007 9:37:35 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-052
C150192
Contractor Name
Upper Arkansas Water Conservancy District
Contract Type
Loan
Water District
11
County
Chaffee
Custer
Fremont
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The District chose to proceed with rehabilitation and expansion, in phases. Phase one <br />will involve rehabilitation of the outlet pipe with epoxy slip lining. This will meet all the <br />State capacity design requirements including requirements of the eventual expansion <br />contemplated in Alternative No.4. The old steel pipe extension and concrete plug will be <br />removed and replaced so as to allow an increase in active storage of 67 acre feet. A new <br />slide gate, trash rack and concrete vault to house the gate mechanism will be included. <br />The spillway width will be increased to 150 feet from the present 50 feet. A seepage <br />filter will be installed on the right abutment. <br />Table 1 shows a cost breakdown for phase one and phase two. Engineering studies <br />conducted by Colorado River Engineering are attached as Appendices E and F. <br /> <br />T bl 1 U <br /> <br />Ark <br /> <br />Wt C <br /> <br />D' 't N rth F k D P' <br /> <br />a e . Jpper ansas a er onservancy Istnc - 0 or am rOJect <br /> NORTH FORK ENLARGEMENT <br /> Engineer's Estimate <br /> Phase One <br />WORK DESCRIPTION COST ESTIMATE <br />General Preparation $ 34,500.00 <br />Outlet Rehabilitation $ 173,125.00 <br />Spillway Enlargement $ 32,396.00 <br />Blanket Filter Right Abutment $ 4,450.00 <br />*Engineering, Surveying, NEPA Permitting (both phases) $ 217,000.00 <br />Contingency $ 54,221.00 <br /> Total Phase One I $ 515,692.00 <br /> Phase Two <br />General Preparation $ 555,850.00 <br />Outlet Extension $ 36,750.00 <br />Spillway Enlargement $ 61,400.00 <br />Embankment $ 1,540,800.00 <br />*Engineering, Permitting, Testing $ 117,000.00 <br />Contingency $ 482,360.00 <br /> **Total Phase Two I $ 2,794,160.00 <br /> GRAND TOTAL $ 3,309,852.00 <br />NOTE: <br />The above costs do not include feasibility costs and legal costs associated with <br />permitting nor do they include local permits. <br />**Phase Two costs assume completion of the Phase One Project as a prerequisite. <br />Costs are estimated at the feasibility level review. Cost estimates to be refined <br />following design packet preparation. <br /> <br />uawcd Feasibility Study Rev.doc <br /> <br />Page 7 of9 <br />