My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02092
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 11:23:36 AM
Creation date
7/13/2007 8:14:38 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150180
Contractor Name
Pinewood Springs Water District
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Prior Planning: Preliminary Engineering Report of 1977: <br />Wright-McLaughlin Engineers prepared a Service Plan for Formation of the Pinewood Springs <br />Water District in 1977 [1]. This Plan recommended boundaries for establishment of the District. A <br />peak day water demand of 83,000 gallons for an ultimate projected development at that time of331 <br />equivalent single family residences (EaR) was identified. Recommended initial improvements to the <br />then existing water system included development of a new central well field, strengthening the <br />distribution system, and construction of Pinewood Springs Reservoir. This Plan was partly <br />implemented; it provides both useful background information and a good starting point for <br />preparation of this Planning Document. More complete descriptions of the present situation and <br />existing facilities are given in the following Sections. <br /> <br />One key part of the Service Plan not implemented was construction of the augmentation reservoir <br />mentioned above. This reservoir was to have a total storage capacity of twenty acre-feet and be <br />located on Lot 5 of Filing 11 as shown on Drawing 1, Altemate 0.1. The District has had to augment <br />its water supply in dry periods by hauling in water. A reservoir as originally envisioned for raw water <br />storage will address system deficiencies during periods of drought and provide a better and more <br />reliable supply of raw water. <br /> <br />Scope: <br />The basic components of a water system master plan include supply, treatment, storage and <br />distribution. Supply includes legal and physical availability of water supplies and, often, transmission <br />and storage of raw water. This report will present an engineering analysis of altemates for providing <br />raw water storage, raw water transmission, treatment, and transmission into the distribution system. <br />The District has previously analyzed availability, storage, and distribution of treated water, and these <br />areas are not the focus of this Planning Document. <br /> <br />The District has completed much of the preliminary planning and this report evaluates only those <br />altemates that resulted from that planning effort. <br /> <br />The District is currently investigating water rights that pertain to the raw water storage altemates that <br />are evaluated in this Planning Document. Consequently, water rights issues were not included in <br />the scope for this report. <br /> <br />Some altemates presented in this Planning Document may include construction in the flood plain of <br />the Little Thompson River. Flood plain mapping is not included in data fumished by the District and <br />preparation of an engineering analysis of flood potential is beyond the scope of this report. Any <br />
The URL can be used to link to this page
Your browser does not support the video tag.