My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02089
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 3:38:46 PM
Creation date
7/13/2007 7:27:38 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150199
Contractor Name
Bijou Irrigation District
Contract Type
Loan
Water District
1
County
Morgan
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan <br />Application <br /> <br />6. Will the acquisition of additional water rights be necessary? YES_ NO --.X <br />If YES, please explain. <br /> <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attomey(s). <br /> <br />NAME <br /> <br />Deere & Ault Consultants <br />Vranesh and Raisch. LLP <br /> <br />ADDRESS and PHONE <br />600 S. Airport Rd. Bldg A Ste 205 (303) 651-1468 <br />P.O. Box 871. Boulder. Co 80306 (303) 443-6151 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with <br />this application. Feasibility Study for Empire Reservoir Spillway Construction issued by <br />Deere & Ault Consultants April 2005 <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br />Estimated Other Costs: <br />Estimated Total Costs: <br /> <br />$ 96.131 <br />$ 534.060 <br />$106.812 (land acquisition, water rights purchase,etc.) <br />$ 740.000(rounded to nearest $10.000) <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ 666.000 (Usually 75-90 % of Est. Total Costs) <br />T erm (length) ofloan: 30 years (Usually 10, 20, or 30 years) <br /> <br />Interest Rate: <br /> <br />2.5 <br /> <br />% (Please call for our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project <br />sponsor have the [mancial capacity to repay any loans made by the CWCB. The following <br />information is needed to assist the CWCB in a preliminary assessment of the applicant's <br />[mancial capacity. It is also requested that the project sponsor submit with this application, <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.