My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison 9-11-06 Meeting Minutes PDF
CWCB
>
Board Meetings
>
Backfile
>
Backfile
>
Gunnison 9-11-06 Meeting Minutes PDF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 4:15:30 PM
Creation date
7/11/2007 12:55:22 PM
Metadata
Fields
Template:
Basin Roundtables
Basin Roundtable
Gunnison
Title
Minutes
Date
9/11/2006
Basin Roundtables - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />September 11, 2006 <br /> <br />Report from the IBCC Representatives <br />Marc Catlin reported that the IBCC meeting would be in Alamosa the next day, and that he needs the <br />criteria information from the Roundtable to report on at the IBCC meeting. <br /> <br />Bill Trampe noted that the Arkansas Valley Roundtable had developed a spreadsheet and would <br />share it with the group. He felt that it might be applicable to the needs of the Gunnison Basin <br />Roundtable. <br /> <br />Bill also mentioned that he was looking for criteria and guideline assessment information to take to <br />the next IBCC meeting in Alamosa. <br /> <br />Education Committee Report <br />Tom Pitts, Endangered Fish Recovery Program, will be making a one-hour presentation at the <br />October meeting. <br /> <br />The Forest Service has asked for an extension of two months to prepare their presentation. <br /> <br />1. Criteria and Guideline Discussion <br />Ralph Grover prepared and distributed a draft document of the comments that he and Tom <br />Huerkamp had received from the Roundtable members. Ralph said he had already received <br />feedback to this document and went over a few changes resulting in a few additional comments. He <br />agreed to make those changes and have the final version to Eric Hecox by Thursday morning. <br />Michelle Pierce will forward the document to all Roundtable members. <br /> <br />Eric Hecox will combine the document with comments from other roundtables and create a draft <br />summary that will be submitted on Friday to the workgroup. The workgroup will then create a <br />document to send to the IBCC. He was unsure if this final document will be returned to the <br />roundtables for review. <br /> <br />The discussion then turned to the funding issues, and what the Gunnison Basin Roundtable will <br />submit to the IBCC regarding distribution of those funds. Some felt that all available funds should <br />be divided equally among all the roundtables throughout the State, others felt that by doing so would <br />limit the funds available for larger projects. After lengthy discussion, and an opinion from the IBCC <br />representatives, Michelle Pierce suggested that funds be distributed to the GBRT in the amount of <br />$500,000 per year for four years, with the stipulation that GBRT has sole discretion on the <br />distribution of the funds. The Roundtable agreed by consensus vote. <br /> <br />Eric Hecox announced that a Request for Qualifications (RFQ) has been submitted for an <br />engineering firm. There are three teams competing for the contract. An Interview Committee <br />consisting of State employees and an IBCC Subcommittee has been formed. Interviews and <br />selection are scheduled for September 25, 2006, and a selection will be made by the end of October. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.