My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150205 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150205 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:17:40 PM
Creation date
7/11/2007 8:14:39 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150205
Contractor Name
Veits Pipeline Company
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />>- NRCS (Natural Resources Conservation Service) 75% cost share for construction, <br />project management, and associated costs; preliminary design and cost estimates, <br />environmental assessment. <br />>- Harward Irrigation Systems final engineering drawings and specifications, pipe and fitting <br />supplies, construction consultation. <br />>- Colorado Water Conservation Board (CWCB) financing. <br /> <br />The Company will be the lead for the financing, design, and construction of the project and <br />will be the entitiy entering into contracts and agreements for the services to be provided. <br /> <br />Financial Analysis <br />The Company is applying for a loan from the CWCB in amount of $574,118 to cover total <br />cost of all construction and materials. Upon final approval of the constructed Project by <br />NRCS, NRCS will pay to the Company the 75% cost share, which will be used by the <br />Company to pay down the loan amount to approximately $143,529. <br />Table 1. Sources of Funding <br />Grant Short-term Loan Long-term Loan <br />$0 $574,118 $143,529 <br />$0 $0 $0 <br />$430,588 $0 $0 <br />Totals $430,588.00 $574,118.00 $143,529.00 <br /> <br />Entity <br />CWCB <br /> <br />Company <br />NRCS <br /> <br />The Company will cover any costs that exceed the NRCS estimated project cost. <br /> <br />The Company is requesting a 30-year loan from the CWCB. The standard agricultural <br />lending rate would be 2.5%, resulting in annual payments of $6,857. The Company will <br />fund a payment reserve account at the outset of the Project in the amount of 4.77% of the <br />value of the long-term loan and increase the reserve account to 9.55% of the long-term <br />loan over 3 years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.