My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150205 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150205 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:17:40 PM
Creation date
7/11/2007 8:14:39 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150205
Contractor Name
Veits Pipeline Company
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The selected alternative, Alternative No.4 will include a new diversion structure; <br />approximately 4.3 miles of PVC pipeline, varying in size from 24 inch down to 4 inch; <br />metered delivery points to each water user; various valves, drains and vents; and river <br />channel improvements to improve efficiency of the river to deliver water to the diversion <br />point. <br /> <br />Cost Estimate <br /> <br />The Cortez Office of the NRCS has prepared preliminary engineering designs and construction <br /> <br />estimates for the Project. The NRCS Preliminary Design report and detailed cost estimate <br /> <br />appear as Exhibit X. NRCS has completed the plan and environmental assessment at no cost <br /> <br />to the Company (p tp$j q 41..-- _ J..-D7.. l \A, rp-z'3 <br />The estimated cost of the project is $~30% or $!J2r23S of which is engineering <br /> <br />cost born by NRCS and the remaining $574,118 is subject to 75% cost share by NRCS. <br /> <br />This leaves approximately $~fo be paid by the Members. <br />~ Z~/"9.:3 <br /> <br />Implementation Schedule <br />Harward Irrigation Systems is expected to complete the final design by midsummer, 2005. <br />Construction is expected to begin October, 2005 and move to completion in phases during 2005 <br />and 2006. <br /> <br />Permitting <br />All easements and rights of way have been verbally secured. The Company expects to be <br />exempt from 404 permitting by Statutory exemption, 33 CFR Section 323.4(a) 3. This will be <br />confirmed by the Army Corps of Engineers. <br /> <br />Institutional Considerations <br />Entities that are, or may be involved in the design, construction and financing of the project <br />include: <br />>- Number Six Ditch Company, Inc. (the consolidation of the former Boss and Number Six <br />Ditch Companies) financing, construction, construction supervision and project <br />management. <br />
The URL can be used to link to this page
Your browser does not support the video tag.