Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />1350 North Main <br />Spanish Fork, UT 84660 <br />Phone: (801) 360-6404 <br /> <br />I <br /> <br />I <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with <br />this application. <br />a. Pipeline Project Feasibility Study <br />b. Mancos Valley Salinity Control Project: Plan and Environmental Assessment (A <br />Copy will be provided upon request) <br />9. Estimated cost of the project. Please inclu <br />construction costs, if known. <br />Estimated Engineering C sts: <br />Estimated Construction <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Estimated Total Costs: <br /> <br />$746,353 <br /> <br />e~ .10 <br />11 (I If, sz3 <br /> <br />I <br /> <br />10. Loan amount and terms you are requesting. <br />$574,118 bridge $143,530 for term <br />Term (length) of loan: years 30 Years <br />Interest Rate: 2.5 % <br /> <br />I <br /> <br />I <br /> <br />Part C. - Project Sponsor Financial Information <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project <br />sponsor have the financial capacity to repay any loans made by the CWCs. The following <br />information is needed to assist the CWCB in a preliminary assessment of the applicant's <br />financial capacity. It is also requested that the project sponsor submit with this application, <br />copies of the three most recent annual reports, financial statements, corporate reports or other <br />current documentation of financial condition and operations. <br />1. List any existing long-term liability (multi-year) or indebtedness that exceeds one <br />thousand dollars. NONE <br />2. Are any of the above liabilities now in default, or been in default at any time in the <br />past? NO <br />3. Please provide a summary of revenues by year. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />2002 <br />Gross dues and assessments $1972 <br /> <br />2003 <br />$1155 <br /> <br />2004 <br />$1400 <br /> <br />I <br /> <br />I <br /> <br />4. Please provide a brief narrative description of sources of funding, in addition to the <br />CWCB, which have been explored for this project NRCS has contracted to pay up <br />to 75% of the project not to exceed $431,668, <br /> <br />I <br /> <br />I <br />