My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150205 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150205 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:17:40 PM
Creation date
7/11/2007 8:14:39 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150205
Contractor Name
Veits Pipeline Company
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />owned by each member. General operating expenses assessed at $100 per <br />year. <br />Number of acres irrigated: 506 Water Right: 9.6 cfs <br />Average water diverted per year: 2051 acre-feet. <br /> <br />I <br /> <br />I <br /> <br />Part B. - Description of the Project <br />1. Name of the project or facility Number Six Ditch Pipeline Project. <br />2. Purpose of this loan application. <br />Rehabilitation or replacement of existing facility. Two separate dirt ditches <br />(Number Six and Boss Ditches) that are nearly parallel for much of their length and <br />serving adjacent landowners will be consolidated into a single pipeline <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />3. Not applicable <br />4. General location of the project. (Please include county, and approximate distance and <br />direction from nearest town, as well as legal description, if known. The heading will be <br />in Montezuma County on the Mancos River near the southwest edge of the Town of <br />Mancos. (12 S 737962E 4136026N). <br />5. Please provide a brief narrative description of the proposed project including purpose, <br />need, facilities, type of water uses to be served and service area. Attach separate sheet, <br />if needed. The Boss DiUi.h and thEt Number Six Ditch will.be combined as th, <br />7 Number 6 Ditch and some shares of water are beina brougbt.-iR from the SI:leek.. <br />Ditch-,-- The purpose of the consolidation is to increase efficiency of water delivery <br />to the service area and to allow participation in the Salinity Control Project <br />underway in the Mancos Valley. Benefits of the pipeline project include reduction <br />in water loss through ditch seepage and evaporation, elimination of ditch <br />maintenance, and production of pressure for more efficient on-farm irrigation <br />water application and delivery of winter livestock water, The service area will <br />remain as mapped in the figure at the end of this document. <br />6. Will the acquisition of additional water rights be necessary? No. Diversion point <br />changes to consolidate the ditches have been requested of the Division Seven <br />Water Court using existing water rights, <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attorney(s). <br />Erin Johnson Attorney at Law <br />675 S, University Blvd. Suite #404 <br />Denver, CO 80209 <br />303-588-2695 <br />Fax 303-744-0972 <br />e-mail: erin@fone.net <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />6 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Harward Irrigation Systems (Engineers) <br />Attn. Marcel W, Orton <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.