My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150192 Approval letter
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150192 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 9:54:07 AM
Creation date
7/10/2007 3:37:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-052
C150192
Contractor Name
Upper Arkansas Water Conservancy District
Contract Type
Loan
Water District
11
County
Chaffee
Custer
Fremont
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Upper Arkansas Water Conservancy District <br />November 9, 2004(Revised November 24, 2004) <br />Page 3 of 4 <br /> <br />Agenda Item 14c <br /> <br />The District chose alternative 4 since it will satisfy all the needs for continued use of the facility <br />including enlarging the spillway to meet the Inflow Design Flood for a Class 1 dam. Rehabilitating the <br />outlet pipe will provide for an additional 50-year design life. The new outlet pipe will take advantage of <br />67 acre-feet of dead storage below the current outlet elevation. The enlargement project will add 500 <br />acre-feet of additional storage. The dam will be raised 15 feet and provide 7 feet of freeboard and allow <br />for the routing of the IDF with 1-foot of freeboard. The footprint of the enlarged reservoir will inundate <br />the access road and portions of the campground and parking lot. In addition, the access road from <br />State Highway 30 will require extensive improvements for construction. Since the reservoir is located <br />on Forest Service property, a NEPA study will be required. <br /> <br />Total Project cost estimate is: <br /> <br />TOTAL <br /> <br />$ 334,000 <br />2.975.850 <br />$3,309,850 <br /> <br />1. <br />2. <br /> <br />Planning/Permitting/Eng ineering <br />Construction <br /> <br />The engineering design, environmental studies and construction related services are provided by <br />Colorado River Engineering and Environmental Solutions, both of Rifle, Colorado. Construction is <br />expected to begin in 2005. <br /> <br />Financial Analvsis <br /> <br />Table 1 shows a summary of the financial aspects of the Project. A CWCS Loan of $2,980,000 would <br />have an annual debt service obligation of $167,240 ($152,040 for annual loan payment and $15,200 for <br />the 10% reserve account) for the loan terms of 3.0% for 30-years. The debt service obligation <br />represents a cost of $153 per acre-foot to rehabilitate and expand the reservoir. <br /> <br />Table 1. Financial Summary of Project <br /> <br />. <br /> <br />Total Proiect Cost <br />CWCS Loan (90% of Total Project Cost)* <br />CWCS Annual Loan Payment <br />CWCS Loan Obligation (including 10% debt reserve) <br />Annual Project Cost per acre-foot (based on enlarged 1095 AF) <br /> <br />$3,309,850 <br />$2,980,000 <br />$152,040 <br />$167,240 <br />$153/ac-ft <br /> <br />. <br />Creditworthiness: The District's Enterprise Fund currently has an outstanding revenue bond for <br />$600,000 which will last until December 2014. The revenue bond was used to purchase the Lake <br />Ranch in October 2004 for $1,200,000. The outstanding debt amount is $600,000 for the water rights <br />purchase on this property. The revenue bonds require a pledge of revenues. CWCS will require parity <br />with the existing loan. The District is not expected to have any additional debt service on this Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.