My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes Feb 2007 CBRT
CWCB
>
Board Meetings
>
Backfile
>
Backfile
>
Minutes Feb 2007 CBRT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 4:16:51 PM
Creation date
7/10/2007 3:08:14 PM
Metadata
Fields
Template:
Basin Roundtables
Basin Roundtable
Colorado
Title
Minutes
Date
2/26/2007
Basin Roundtables - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />November 27,2006 <br /> <br />1. The CBRT approved unanimously a motion by Lane Wyatt that CDM prepare a non- <br />consumptive needs assessment of the Colorado River basin. <br /> <br />2. The CBRT approved unanimously a motion by Lurline Cunan that the CBRT join the Arkansas, <br />Denver Metro, and South Platte roundtables in requesting that SB 179 funds be used for a 10825 <br />Water nonconsumptive needs assessment. <br /> <br />3. Tom Pitts, P.E., water user's representative for the Upper Colorado River Endangered Fish <br />Recovery Program, discussed minimum stream flow requirements to protect endangered fish in <br />the Colorado River through Garfield and Mesa Counties. <br /> <br />4. Tim Sarmo, Town Manager of Palisade, and Pete Atkinson ofW ATER, requested $100,000 <br />from SB 179 to fund the Palisade whitewater park at the Price Stubbs roller dam just upstream of <br />Palisade on the Colorado River. Decision on the grant request was postponed until the <br />December CBR T meeting. <br /> <br />December 18, 2006 <br /> <br />1. The CBRT voted on the following grant requests; 18 votes needed to forward to the CWCB for <br />consideration: <br /> <br />CBRT CBRT Applicant and Grant Purpose CBRT CBRT <br />Approval Approval V ote to V ote to <br />to Spend to Spend spend spend <br />CBRT $ CWCB $ CBRT CWCB <br /> Funds Funds <br />$40,000 Ruedi Power Authority - Roar Fork Watershed 27 7 <br /> Plan <br />30,000 Grand County - Stream Management Plan 27 6 <br /> methodology <br /> 250,000 Eagle County - Increase Eagle Park Reservoir by 24 <br /> 155 acre feet <br /> 1,500,000 Grand County - Purchase share in Vail Ditch 26 <br /> 300,000 CBRT - Join with Yampa Roundtable for Energy 25 <br /> Development Water Needs Assessment <br /> 25,000 CBRT - Join with Metro Denver and South Platte 25 <br /> Roundtables for analysis of 10825 Water and <br /> Endangered Fish Recovery Program <br /> Bull Creek Reservoir Co. - Enlarge reservoir. 13 16 <br /> $150,000 request, did not pass <br /> Palisade - Price Stubbs Roller Dam Whitewater 5 10 <br /> Park - $100,000 did not pass <br /> <br />L\CWCB Imaging\Caleb\Minutes\Colorado\2007\Minutes Feb 2007 CBRTdoc <br /> <br />4 <br /> <br />7/l< <br />
The URL can be used to link to this page
Your browser does not support the video tag.