My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02041
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 3:16:45 PM
Creation date
7/10/2007 1:35:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150241
Contractor Name
DeBeque, Town of (Acting by and through its Irrigation System Enterprise)
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The cost estimate for 12" irrigation pipeline, phase I: <br />1. 12" PVC-c1200@ 1,000 ft <br />2. 12" PVC-sch.80 @ 1,800 ft <br />3. 12" gate valves @ 6 ea. <br />4. 12"xl2"xl2 pvc tees@ 4 ea <br />5. 12"x12"x4" pvc tees @ 2 ea <br />6, 12"x12"x6" pvc tees@ 4 ea <br />7. 30" pvc sleeve @ 100 ft <br />8. asphalt remove & rep1.@ 140 sq.yds <br />9, pvc cap installation@ 8 ea <br />10. 12" bore @ 60 ft <br />11. 12" perforated pvc install@560 ft <br />12. 4 ft storm inlet@ 1 ea. <br />13. mobilization <br />14. Materials <br />15. Phase I — Engineering <br />TOTAL <br />$ 15,000 <br />$ 21,600 <br />$ 3,600 <br />$ 2,400 <br />$ 1,200 <br />$ 2,400 <br />$ 1,500 <br />$ 5,000 <br />$ 800 <br />$ 11,100 <br />$ 3,360 <br />$ 2,500 <br />$ 7,500 <br />$ 30,004 <br />$ 17,590 <br />$ 120,149 <br />See attachment for Material and Engineering costs, since they are not included <br />above. (total= $ 47,349 per Town of DeBeque shaze) <br />Total project identified for tlus request =$ 370,000 <br />Institutional Requirements: <br />This construction would require a 404 permit from the US Corps of <br />Engineers. The Town has a similaz intake structure for the Domestic <br />water supply system and this new intake will not interfere with the <br />efficiency of the first. The proposed improvements are intended to make <br />the domestic water intake more efficient. <br />Pg. 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.