Laserfiche WebLink
The cost estimate for 12" irrigation pipeline, phase I: <br />1. 12" PVC-c1200@ 1,000 ft <br />2. 12" PVC-sch.80 @ 1,800 ft <br />3. 12" gate valves @ 6 ea. <br />4. 12"xl2"xl2 pvc tees@ 4 ea <br />5. 12"x12"x4" pvc tees @ 2 ea <br />6, 12"x12"x6" pvc tees@ 4 ea <br />7. 30" pvc sleeve @ 100 ft <br />8. asphalt remove & rep1.@ 140 sq.yds <br />9, pvc cap installation@ 8 ea <br />10. 12" bore @ 60 ft <br />11. 12" perforated pvc install@560 ft <br />12. 4 ft storm inlet@ 1 ea. <br />13. mobilization <br />14. Materials <br />15. Phase I — Engineering <br />TOTAL <br />$ 15,000 <br />$ 21,600 <br />$ 3,600 <br />$ 2,400 <br />$ 1,200 <br />$ 2,400 <br />$ 1,500 <br />$ 5,000 <br />$ 800 <br />$ 11,100 <br />$ 3,360 <br />$ 2,500 <br />$ 7,500 <br />$ 30,004 <br />$ 17,590 <br />$ 120,149 <br />See attachment for Material and Engineering costs, since they are not included <br />above. (total= $ 47,349 per Town of DeBeque shaze) <br />Total project identified for tlus request =$ 370,000 <br />Institutional Requirements: <br />This construction would require a 404 permit from the US Corps of <br />Engineers. The Town has a similaz intake structure for the Domestic <br />water supply system and this new intake will not interfere with the <br />efficiency of the first. The proposed improvements are intended to make <br />the domestic water intake more efficient. <br />Pg. 3 of 5 <br />