Laserfiche WebLink
<br />Ma"" 14 05 03:18p <br /> <br />PC-2 <br /> <br />970-4645928 <br /> <br />p.2 <br /> <br />Mike Serlet <br />February 1, 2005 <br />Page 2 <br /> <br />emergency spillway to solve the overtopping problems caused by ice in the winters, <br />allowing us to carry our full water right for power generation in the wintertime, and <br />repair or replace the Stokes Gulch Siphon. <br /> <br />The OMID is requesting consideration from the Colorado Water ConseIVation <br />Board for assistance in funding this feasibility study with a matching grant in the amount <br />of $15,000. It is our intention to take the results of the feasibility study to our landowners <br />for authorization to borrow enough money from the Colorado Water Conservation Board <br />to attend to the above-referenced items beginning with siphon replacement on November <br />1,2005, ifat all possible. The condition of the Stokes Gulch Siphon creates a sense of <br />urgency in this matter. <br /> <br />We would appreciate your consideration of this request and any assistance you <br />might be able to provide. <br /> <br />(;?;~ <br /> <br />Rita Crumpton, Manager <br />Orchard Mesa Irrigation District <br /> <br />Ene. <br />