My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02027
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:39 AM
Creation date
7/9/2007 3:24:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0044FX
Contractor Name
Larimer County, Board of County Commissioners
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />to be $300,000. The cost of preliminary engineering studies to date has totaled about $150,000. <br />Total project construction cost is therefore estimated to be $5,450,000. <br /> <br />The proposed system will be constructed by the City of Fort Collins and Larimer County as a <br />coordinated effort. The respective amounts to be contributed by the two governments, will be <br />based on the amount of incorporated versus unincorporated land in the floodplain of Dry Creek. <br />On this basis, the City of Fort Collins will be liable for 53% of the project cost, and Larimer <br />County will be liable for 47% of the total cost. On this basis, the amount to be paid by Larimer <br />County is $2,500,000, and the amount to be paid by the City of Fort Collins is $2,950,000. The <br />amount to be paid by Larimer County for the project as well as part of the amount to be paid by <br />the City of Fort Collins is intended to be paid by the proceeds of a loan from the Colorado Water <br />Conservation Board in the amount of $3,900,000. <br /> <br />Table I below is a summary ofthe anticipated division of project elements to be constructed by <br />City and by County: <br /> <br />Table 1. Division of Construction Responsibility <br /> <br />City Construction <br /> <br />Construction of Larimer Weld Canal Spill Structure - <br />Construction of East Vine Channel <br />Implementation of SCADA System <br /> <br />Design, Engineering and Cons. Contingency 25% <br /> <br />Total City <br /> <br />County Construction <br /> <br />Construction of Douglas Spillway Enhancements <br />Construction of Improvements to Dry Creek Channel <br />Construction of Detention Storage Facilities <br /> <br />Design, Engineering and Construction 25% <br />Right of Way Purchase <br /> <br />Total County <br /> <br />City $200,000 <br />City 800,000 <br />City 150,000 <br /> 287,500 <br /> $1,437,500 <br />County $300,000 <br />County $200,000 <br />County 2,300,000 <br /> 800,000 <br /> 300,000 <br /> $3,900,000 <br /> <br />9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.