<br />Th.e drawings ,and s.pecifica:tions will be comp],eted in accordan.ce 'with the S'EO guidelines,~ Th.e
<br />package wwl1 ;aUow 'Orc,hard C'ity, the, opportunity to revriew the co-nstruct],on documents prior to
<br />submittal to the SEO, bi,dding: and oonst:ruction~
<br />
<br />R.e:vlew COnnD.en,'tg r-elatedto Ihe draft final,des.ign. will be incorporated into ,8 '[mal design, :report.
<br />Engineer wi~l submit five (5) copies ofth.e fmal design repo'.ft~ In addition'J the En,gineer wi! I
<br />pr=Dvide:an electronic version of the repo,rt M.d associated docwnents on a compact disc (CD) in
<br />pdf ftnmat that iscompatibJe v~dth Orchard ;C]ty~s co,mputer :system~
<br />
<br />Task A600':: Dam Sa,Cety. .ApplicaJioD
<br />
<br />E'og:ineer willI .assis,t Orchard City in obtaining appr,ov.al to construct the D,arn from the Colorado
<br />S'tate' Engineer"s Q:ffice (SE'O),.,.. As required, the: Engineer will. contact the SED,. ,prepare tbe
<br />do,cuments for Orchard City review and ,obtain, Ofr.chard Cily~sapproval for the S-EOapplication,
<br />to 'constru'c~. a d,am.. The engin,eer willI. address any questions regarding the application with the
<br />SEO Wld make tIle necessary revisions.. The requi~ed d.ocume'nts fo.ctbe SEO, ap,proval to,
<br />oonstruct a new dam include: the following:
<br />
<br />.l Application Fonn
<br />:.1 D,esign ,Drawings
<br />· Specifications
<br />· ,Design report cons:isting' of
<br />Hy'dr,ology ~port
<br />Ge.otecbnical repo,rt
<br />Instn.lmentati.on Plan
<br />Eng:weer' 5 cost estimate
<br />I. Filing fee
<br />
<br />F,ollovving approval for COItStructiOD; put prio,t to flna'~ inspection of the D'anlj, the fo!lJ.owiog
<br />docum.en'tsneed to be pr1epar,edan,d, submitted to 'the SEO for 8:p,proval befor'e initial filling' of
<br />'the reservoir may begin: ~
<br />
<br />.. :C.onstru.ction Report
<br />.1 In:iti al F'j ~ ~ing Plan
<br />· Lo:ng...te'nn m,nrutonng plan
<br />· Em,ergen.cy Prep'aredn.ess, Plan
<br />
<br />Supp,orting, i.nformati.on for'th'e information listed abo,veconsists of ' but is :n'ot limitied, to, dam
<br />failure inund..atio.n m,aps .and, .an In,strumentation M"on'itofingand Repo1rtingPlani Thes.e items are
<br />n,ot include)d in, th.e Final Design Scope ofW'o[k~
<br />
<br />It should beo,oted that members Q,four te.am have favorable re]ation,ships with, th.e SEO ,Wld ha:ve
<br />worked with m-ost of the c'urre.nt S.EO staffo.n a number o'frecent, dam de.signs and
<br />
<br />8
<br />
|