My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02019
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:39 AM
Creation date
7/9/2007 11:16:42 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0069FX
Contractor Name
Fountain, City of
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> TABLE 2 <br /> FRY-ARK WATER USAGE <br /> Fry-Ark Fry-Ark Purchases Percent <br />Year Allocation <br /> (ac-ft) ac-ft mil gal Utilization <br />1996 1 ,400 1,346 438.5 96 <br />1997 1,500 1 ,437 468.4 96 <br />1998 1,600 1,539 501.6 96 <br />1999 1,700 1,647 536.6 97 <br />2000 1,800 1,735 565.4 96 <br />2001 1,900 <br /> <br />Because the Fry-Ark water supply is not sufficient to meet all of Fountain's <br />water needs (particularly during the summer months), the City routinely <br />supplements the Fry-Ark supply with water pumped from four City-owned wells. <br />Table 3 provides a breakdown of the annual water production from each of the <br />City's four wells for the years 1996 through 2000. The annual pumpage data <br />summarized in Table 3, combined with a review of the daily operating records, <br />indicates that Well No. 3 is the most highly utilized of the four wells while Well <br />No.4 is the least utilized. <br /> <br /> TABLE 3 <br /> WELL PRODUCTION <br /> Well No.1 Well No.2 Well No.3 Well No.4 Total <br />Year mil gal mil gal mil gal mil gal (mil gal) <br /> percent percent percent percent <br />1996 26.1 18 62.9 42 57.4 39 1.9 1 148.3 <br />1997 22.4 12 50.4 28 94.3 53 12.5 7 179.6 <br />1998 32.9 17 52.3 27 92.9 49 13.5 7 191.6 <br />1999 10.3 9 55.3 48 46.9 40 3.4 3 115.9 <br />2000 62.6 35 42.9 24 68.8 38 6.5 3 180.8 <br />2001 <br /> <br />Table 4 provides a summary of annual Fry-Ark water purchases and city well <br />production for the past five years. Total annual water use within the Fountain <br />system was determined by adding the volume of water pumped from the City wells <br />to the annual Fry-Ark water purchases. As shown in Table 4, Fountain's annual <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.