Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table of Contents <br /> <br />Introduction 1 <br />Purpose 1 <br />Description of Study Area 1 <br /> <br />Secondary Water Supply Concept 3 <br />Role of Canal Company 4 <br />Design and Operation Concept 4 <br />Phased Development 8 <br />Point-of-Connection and Metering 8 <br /> <br />Funding Opportunities for Secondary Supply 11 <br />Funding Opportunities with the Colorado Water Conservation Board 11 <br />System Development and Construction Financing Approach 12 <br /> <br />Short-term Canal Modernization Opportunities 13 <br />Improvements to Control, Regulation, and Measurement 14 <br />Improvements to Canal Conveyance 19 <br />SCADA and Canal Automation 21 <br />Off-Ditch Storage for Re-Regulation 24 <br /> <br />Conclusions and Recommendations 24 <br /> <br />Aqua Engineering, Inc. <br />November 17,2004 <br /> <br />Final Canal Modernization Study <br />- i - <br />