My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02013
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:38 AM
Creation date
7/9/2007 10:01:55 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0071FX
Contractor Name
New Consolidated Lower Boulder Reservoir and Ditch Company
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 2. Water Use Calculations <br /> <br />Lower Boulder Irrigated Area <br /> <br />BLUEGRASS <br /> <br />AREA, acres <br /> <br />2271 <br /> <br />PEAK SEASON DESIGN <br />IRRIGATION REQUIREMENT, inches/day <br /> <br />OPERATING LOSS, inches <br /> <br />0.23 (3) <br /> <br />(1) <br /> <br />0,06 <br />0,29 <br />54.88 <br />17,882,800 <br />30 <br />3.0 <br />27.0 <br />5109.8 <br />1,665,032,000 <br /> <br />TOTAL DAILY APPLICATION REQUIREMENT, inches <br />TOTAL DAILY APPLICATION REQUIREMENT, acre*ft <br />TOTAL DAILY APPLICATION REQUIREMENT, gallons <br />SEASONAL IRRIGATION REQUIREMENTS, inches <br />SEASONAL EFFECTIVE PRECIPITATION, inches (4) <br />TOTAL SEASONAL IRRIGATION APPLICATION, inches <br />TOTAL SEASONAL IRRIGATION APPLICATION, acre*ft <br />TOTAL SEASONAL IRRIGATION APPLICATION, gallons <br /> <br />IRRIGATION FLOW REQUIREMENT WITH <br />AN IRRIGATION WINDOW OF 8 HOURS, (gpm) <br /> <br />IRRIGATION FLOW REQUIREMENT WITH <br />AN IRRIGATION WINDOW OF 10 HOURS, (gpm) (2) <br /> <br />(2) <br /> <br />46,570 <br /> <br />37,256 <br /> <br />IRRIGATION FLOW REQUIREMENT WITH <br />AN IRRIGATION WINDOW OF 12 HOURS, (gpm) (2) <br /> <br />31,047 <br /> <br />IRRIGATION FLOW REQUIREMENT WITH <br />AN IRRIGATION WINDOW OF 14 HOURS, (gpm) (2) <br /> <br />26,611 <br /> <br />NOTES: <br /> <br />1) PROPOSED IRRIGATION SYSTEM OPERATIONAL EFFICIENCY IS ASSUMED TO BE 80%, <br />2) PROPOSED IRRIGATION SYSTEM TAP UTILIZATION EFFICIENCY IS ASSUMED TO BE 80%. <br />TAP UTILIZATION EFFICIENCY IS DEFINED AS THE AVERAGE DESIGN FLOW/AVERAGE <br />AVAILABLE FLOW. <br />3) PEAK SEASON IRRIGATION REQUIREMENT OF 0,23 IN/DAY IS ASSUMED FOR BLUEGRASS <br />AND IS BASED ON NATIONAL WEATHER SERVICE DATA AND A CROP COEFFICIENT OF 0.80. <br />4) A SEASONAL PRECIPITATION OF 12- INCHES IS USED AND IS BASED ON NATIONAL WEATHER <br />SERVICE INFORMATION. PRECIPITATION IS ASSUMED TO BE 25% EFFECTIVE. <br /> <br />Aqua Engineering, Inc. <br />June 2004 <br /> <br />Canal Modernization Feasibility Study <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.