Laserfiche WebLink
<br />Lake Canal Company <br />Proposal for a Study of Modernization-Pressurization Potential <br />page 3 <br /> <br />9. Consider canal lining options: <br /> <br />o PAM I clay. <br />o Membrane. <br />o Piping. <br />o Concrete. <br /> <br />10. Consider SCADA implementation: <br /> <br />o Costs. <br />o Priorities. <br />o Phasing. <br /> <br />11. Consider pressurization, <br /> <br />o Phasing. <br />o Costs. <br />o Approach (more analysis of secondary supply "big" subunits versus "small" subunits). <br />o Master Plan of pressure piping within the Lake Canal service area. <br /> <br />12. Economics: <br /> <br />o Probable costs for all improvements. <br />o Financing. <br />o Payback. <br />o Impact on future assessments. <br />o Forecast future impacts of urbanization and potential secondary supply integration into <br />the Greeley #2 and Lake Canal systems. <br /> <br />Specific deliverables resultina from this proiect are anticipated as follows: <br /> <br />1. GIS data for Lake Canal to complement and expand on the existing database. All GIS data will be <br />compatible with ESRI's ArcView ArcMap, version 8,1, and delivered on CD media. <br /> <br />2. Supportive system maps showing recommended canal system improvements and concepts of <br />pressurization. A Master Plan map will be prepared to show canal improvements and concepts of <br />probable pressure piping to provide for pressurized delivery to future urban projects as well as <br />agricultural projects. <br /> <br />3, A formal feasibility study report to Lake Canal and CWCB to describe results of the work and to <br />make recommendations for future improvements. <br /> <br />Proposed Feasibility Study Costs <br /> <br />This project, as proposed, is building on work that has already been completed or that is in progress. We <br />propose to complete the work described within a budget of $1 0,000. We will assist in the preparation of a <br />