My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02010
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2010 9:25:17 AM
Creation date
7/9/2007 9:25:54 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
04000000048
Contractor Name
Lake Canal Reservoir Company
Contract Type
Grant
Water District
0
County
Larimer
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Lake Canal Company <br />Proposal for a Study of Modernization-Pressurization Potential <br />page 3 <br /> <br />9. Consider canal lining options: <br /> <br />o PAM I clay. <br />o Membrane. <br />o Piping. <br />o Concrete. <br /> <br />10. Consider SCADA implementation: <br /> <br />o Costs. <br />o Priorities. <br />o Phasing. <br /> <br />11. Consider pressurization, <br /> <br />o Phasing. <br />o Costs. <br />o Approach (more analysis of secondary supply "big" subunits versus "small" subunits). <br />o Master Plan of pressure piping within the Lake Canal service area. <br /> <br />12. Economics: <br /> <br />o Probable costs for all improvements. <br />o Financing. <br />o Payback. <br />o Impact on future assessments. <br />o Forecast future impacts of urbanization and potential secondary supply integration into <br />the Greeley #2 and Lake Canal systems. <br /> <br />Specific deliverables resultina from this proiect are anticipated as follows: <br /> <br />1. GIS data for Lake Canal to complement and expand on the existing database. All GIS data will be <br />compatible with ESRI's ArcView ArcMap, version 8,1, and delivered on CD media. <br /> <br />2. Supportive system maps showing recommended canal system improvements and concepts of <br />pressurization. A Master Plan map will be prepared to show canal improvements and concepts of <br />probable pressure piping to provide for pressurized delivery to future urban projects as well as <br />agricultural projects. <br /> <br />3, A formal feasibility study report to Lake Canal and CWCB to describe results of the work and to <br />make recommendations for future improvements. <br /> <br />Proposed Feasibility Study Costs <br /> <br />This project, as proposed, is building on work that has already been completed or that is in progress. We <br />propose to complete the work described within a budget of $1 0,000. We will assist in the preparation of a <br />
The URL can be used to link to this page
Your browser does not support the video tag.