My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02010
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2010 9:25:17 AM
Creation date
7/9/2007 9:25:54 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
04000000048
Contractor Name
Lake Canal Reservoir Company
Contract Type
Grant
Water District
0
County
Larimer
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Lake Canal Company <br />Proposal for a Study of Modernization-Pressurization Potential <br />page 2 <br /> <br />Scope of Work and Project Goals <br /> <br />The work described and proposed here will build on and dovetail with the work completed to date through <br />the dual systems project and through Stephen Smith's canal modernization work since last fall. It should be <br />noted that the existing GIS database and the GIS data to be collected as a part of this project will be fully <br />compatible with, and used as input to, GIS application software referred to as ESRI's ArcView ArcMap, <br />version 8.1, <br /> <br />Specific tasks associated with this proiect are as follows: <br /> <br />1. GIS data base expansion which is expected to include but not be limited to: <br /> <br />o Timnath and Windsor growth boundaries. <br />o Probable future housing development projects for suitable time periods, Time periods <br />are conceptualized to be the present, 2003 to 2005, 2006 to 2007, 2007 to 2009, etc. <br />o Review and tighten I strengthen service area notations for fields, overall service area <br />boundaries, cropping patterns, and headgates along with the fields irrigated by <br />indMdual headgates. <br /> <br />2. Evaluate cropping patterns past and future. <br /> <br />3. Input well locations following analysis of the wells survey information solicited from Lake Canal <br />shareholders, <br /> <br />4. Take GPS data points for existing wells and headgates. Take photos of the same features during <br />the data collection effort. <br /> <br />5. With Board approval and oversight, initiate more secondary supply discussions with Windsor, <br />Timnath, and Larimer County. <br /> <br />6. With Board approval and oversight, continue secondary supply discussions with Fort Collins- <br />Loveland Water District including a potential presentation to FC-LWD Board and facilitation of a <br />joint meeting of the two Boards. <br /> <br />7. Inventory existing structures: <br /> <br />o Inventory and catalog. <br />o Estimate remaining useful life . <br />o Prioritize repair and replacement needs, <br /> <br />8. COl1sider future structures, equipment, and reservoirs: <br /> <br />o Checks. <br />o Gates. <br />o Flow measurement. <br />o SCADA. <br />o Storage reservoirs. <br />o Equalizer reservoirs. <br />