My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00179 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00179 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:46:28 PM
Creation date
7/6/2007 10:39:08 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/23/2007
Description
Director's Report - CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />rights on the Roaring Fork River. Staff, in cooperation with the Attorney General's Office, <br />has negotiated a settlement to ensure that the CWCB's instream flow water rights will not <br />be injured. <br /> <br />The Board holds the following instream flow water rights that could have been injured by <br />this application: <br /> <br />CWCB Stream/Lake Amount Approp. Watershed County <br />Case No. (ds) Date <br />5-76W2948 Roaring Fork River 32 1/14/76 Roaring Fork River Pitkin <br />5-85CW646 Roaring Fork River 55/30 11/08/85 Roaring Fork River Pitkin, <br />Eagle <br /> Pitkin, <br />5-85CW639 Roaring Fork River 145/75 11/08/85 Roaring Fork River Eagle, <br /> Garfield <br /> <br />. <br /> <br />The CWCB and the Applicant have agreed to the entry of a decree that will prevent <br />injury to the Board's ISF water rights on the Roaring Fork River. The Applicant has <br />agreed to the following terms and conditions: <br /> <br />. Applicant acknowledges that the Colorado Water Conservation Board's instream <br />flow water rights on the Roaring Fork River, decreed in Case Nos. 76W2948, <br />85CW646 and 85CW639 are senior to the Beirne Pump and Pipeline and Beirne <br />Pond water rights. <br />. At times when the CWCB has placed a call for said instream flow water rights, <br />Applicant (1) shall not divert from the Beirne Pump and Pipeline without <br />making replacements, as described below, and (2) shall release water from the <br />Beirne Pond to offset out-of-priority depletions from evaporation from the Beirne <br />Pond. <br />- When the CWCB has placed a call, inflows and outflows of the pond shall <br />remain equal and evaporation caused by the Beirne Pond shall be <br />replaced on a monthly basis or as frequently as may be directed by the <br />Division of Engineer and/or the Water Commissioner. Applicant shall <br />lower the pond water level by removing boards from the outlet works as <br />necessary to replace evaporation resulting from both the recirculating <br />flow and normally occurring pond evaporation. Furthermore, Applicant <br />shall not replace any boards or otherwise increase the pond water level <br />for the duration of the CWCB call period. <br />- All 0.775 acre-feet of water decreed to the Beirne Pond will be available <br />for release, if necessary. <br />· The State Engineer shall curtail all out-of-priority diversions, the depletions from <br />which are not so replaced as to prevent injury to vested water rights. <br /> <br />. <br /> <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.