My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00162 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00162 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:46:05 PM
Creation date
7/6/2007 10:38:31 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/22/2007
Description
CF Section - New Project Loans - Black Dike Pipeline Company - Black Dike Pipeline Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />- <br />I <br /> <br />:'iOlHIII'OUIlRE IRRIGA TlO:\' CO~IJ'A:'iY <br />~IJ:-;ERS I.AKE REIIAIIII.ITATlO:'i <br />- ~ <br /> <br />. <br /> <br /> <br />Compll'h'd I'ruject Looking SoUtll\H'..t Ann.... nam Face <br /> <br />Projcct Dc-scription <br /> <br />The North Puudre Irrigation Company (NPIC) O\\"S and operates 22 storage rcSt.'fVoirs and <br />approximately 200 miles of ditches to a service area of 42.000 acres. Miners Lake was restricted to a <br />storage capacity of 257 AF by the SEO's due to an aging outlet works, inadequate spillway, and seepage <br />along the toe. The existing dam is a Class 2 facility. 800' in length. and IS-I\. in height. This project <br />involved the rcgrdding the upstream dam face and adding rip rap. rcg3rding and reinforcing the: dow1lstream <br />face of the dam. new outlet works. adding a tilter hlanket and toe drain system and cnlarb.;ng the spillway. <br />The project comm(."Tlccd construction in February of 2006 and was completed in the summer of 2006. <br />NPIC requested an additional $120,000 in loan funds in July of 200610 cover unforcscl"tl work, construction <br />modifications, and additional dredging. <br /> <br />Proiect (lata <br /> <br />Sponsor: North Poudre Irrigation Company Counly: Larimer \Vater Source: POlldre River <br /> <br />Tenm of LO:ln: S735,280@3.25% for 30-yrs. Suhstantial Complerion Hale: February I, 2007 <br /> <br />I>esign Engineer: Hines Irrigation, Inc. - Fort Collins, Colorado <br /> <br />COIPilruclion Contrnclor: Schmidt Earth Building, Inc. - Windsor, Colorado <br /> <br />Uesign Elemenls: <br /> <br />Reservoir Capacity = 674 Acre-feet <br />121,000 Cubic Yards of Material Removed <br />24-inch Diameter RCP Outlet Pipe with Gate & Stem <br /> <br />AHragc Annu:l1 ()l'Ii\'l"r~:: 44,400 acre-feet <br />
The URL can be used to link to this page
Your browser does not support the video tag.