Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />TOWN OF KRD1~II.I;\G <br />RAW WATER 1lISTRIIlUTIO;\ I'IUl.lECT <br />-J <br /> <br /> <br />, <br /> <br />-, <br /> <br />.~!.~ <br />'. <br />- <br /> <br />, <br />. <br /> <br />/4 <br /> <br />I'umllllou\l.' <br /> <br />ProiCCI I)l'sr.-ip'ioll <br /> <br />This 52.500,000 project involves the construction of a raw water supply pipeline from the <br />Colorado River to the Town's existing waler treatment facility. The pipeline project allows the <br />Town of Krcmmling to access their conditional 3 cfs now right out of the Colorado River, which <br />will be delivered to the treatment plant. released and stored at Jones No.2 Reservoir and then used <br />to augment the town's current water supply. The Town's current water supply consists of a 6 cfs <br />now right from Sheep Creek. which is ovcr.adjudicatcd and is historically only available during <br />spring runolY. <br /> <br />"micct nata <br /> <br />Sponsor: Town of KrcmmJing <br /> <br />Count)': Grand <br /> <br />\Valn SOUfCI': Colomdo River <br /> <br />Terms of Loom: SI,653,060@4.25%for30-yrs. Substantinl Completion Date: April I, 2007 <br /> <br />D..>siJ.:n Engineer: R.T.W. Engineering, lnc. - Fon Collins. Colorado <br /> <br />Contnlctor: Duckcls Constmction. Inc. - Steamboat. Colorado <br /> <br />Construction Elements: 10.000 1.f. -12.inch HOPE <br />2 -50 Horsepower Pumps. Pump house and Control Vaults <br />100 AF Water Purchase from River District out of Wolford Mtn. Res. <br /> <br />AnraJ.:c Anllllall)rJinry: 400 aere-fect <br />