My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01997
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:05:10 AM
Creation date
7/3/2007 1:46:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0065FX
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I COAL CREEK FEASIBILITY STUDY <br /> ENGINEER'S OPINION OF PROBABLE PROJECT COSTS <br />I AL TERNA TIVE 3: DIVERSION CANAL (OR PIPE) TO WINDSOR DITCH <br />ITEM UNIT QUANTITY UNIT COST TOTAL COST <br />I Excavation and Backfill CY 57700 $7 $403,900 <br /> 2 Stage Concrete Detention EACH $50,000 $50,000 <br /> Dam Outlet Structure <br />I Embankment Spillway EACH $60,000 $60,000 <br />I Reinforced Concrete Pipe EACH $6,000 $6,000 <br />For Detention Dam Outlet <br />(FOR CANAL OPTION) <br />I Reinforced Concrete Pipe LF 5640 $100 $564,000 <br />(FOR PIPE OPTION) <br /> Concrete transition structure into LS $15,000 $15,000 <br />I Windsor Canal <br />Box Culvert Improvements at LF 300 $300 $90,000 <br /> Interstate 25 <br />I Windsor Ditch Channel LS $250,000 $250,000 <br />Channel Improvements <br />I Farm Land Inundation Easement ACRE 120 $100 $12,000 <br /> Right-of-way Acquisition ACRE 7,8 $15,000 $117,000 <br />I Right-of-way Construction Permit LS $7,500 $7,500 <br /> Surveying LS $30,000 $30,000 <br />I Engineering (at approx 8%) LS $140,000 $140,000 $230,000 <br /> FEMA Mapping LS $45,000 $45,000 <br />I Legal LS $50,000 $50,000 <br /> One Time Crop Loss Fee LS $60,000 $60,000 <br />I Road Repair SY 332 $81 $26,892 <br /> Traffic Control LS $25,000 $25,000 <br />I Utility Crossings LS 12 $4,000 $48,000 <br />I Subtotal $1,436,292 $2,359,074 <br />Contingency (at 25% of Subtotal) $359,073 $589,769 <br />I Total $1,795,365 $2,948,843 <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.