My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01997
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:05:10 AM
Creation date
7/3/2007 1:46:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0065FX
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I COAL CREEK FEASIBILITY STUDY <br /> ENGINEER'S OPINION OF PROBABLE PROJECT COSTS <br />I ALTERNATIVE 2: DETAINED DIVERSION TO BOXELDER CREEK <br />ITEM UNITS QUANTITY UNIT COST TOTAL COST <br /> Excavation of canal to Boxelder Creek CY 65,000 $3 $195,000 <br />I And Embankment <br />2 Stage Concrete Detention Dam Outlet EACH $10.000 $10,000 <br />I Spillway EACH $40,000 $40.000 <br />Reinforced Concrete Pipe Detention Dam EACH $6,000 $6.000 <br />I Precast Culvert Sections Railroad Crossing L.F. 150 $80 $12,000 <br />Concrete Ditch Transitions Railroad Crossing CY 35 $100 $3,500 <br /> Boring and Jacking Precast LF 150 $100 $15.000 <br />I Box Culvert Under Railroad <br />Concrete Drop at Boxelder Creek EACH $20,000 $20.000 <br />I Modifications to Existing Bridges CR64 & Hwy 1 LS $350,000 $350.000 <br />Modifications to Existing LS $125,000 $125.000 <br /> Railroad Bridge South of HWY 1 <br />I New Bridge at CR 62 LS $150,000 $150,000 <br /> Boxelder Creek Channel LS $280.000 $280,000 <br />I Improvements Through Town <br />and bike trail (Excavation, seeding and biketrail) <br /> Inverted Siphon For North Poudre EACH $3,000 $3.000 <br /> Irrigation #3-East Lateral <br />I Farm Land Inundation Easement ACRE 80 $100 $8,000 <br /> Right-of-way Acquisition ACRE 21 $15.000 $315,000 <br />I Right-of-way Construction Permit LS $7,500 $7,500 <br /> Surveying and Mapping (Box Elder Creek) LS $35,000 $35.000 <br />I Engineering (at approx 8%) LS $195,000 $195,000 <br /> Legal LS $50.000 $50,000 <br />I FEMA Mapping LS $65.000 $65,000 <br />One time Crop Loss Fee LS $60.000 $60,000 <br />I Road Repair SY 166 $81 $13.446 <br />Traffic Control LS $25,000 $25.000 <br />I Utility Crossings LS 12 $4,000 $48.000 <br />Railroad Right-of-way permit LS $15.000 $15,000 <br />I Subtotal $2,046,446 <br />Contingency (at 25% of Subtotal) $511,612 <br /> Total $2,558,058 <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.