My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01997
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:05:10 AM
Creation date
7/3/2007 1:46:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0065FX
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> 3 percent increase in Increased Property Project Costs, see <br /> insurance premiums Values, 180 private spreadsheet, <br /> per year properties Appendix A <br /> 180 habitable Reduced cost of detention facility <br /> structures floodplain maintenance cost <br /> management <br /> Project Constructed Flow in Windsor Cost of mitigating <br /> m one year Canal may be flooding potential <br /> attractive nuecence north of Town <br /> (safety) planning area <br />Four - Reduced flow 50-year design life 180 structures One year of flood <br />through Town removed from insurance, 180 <br /> floodplain structures <br /> 3 percent increase in Increased property Project Costs, see <br /> . . values, 180 private spreadsheet, <br /> msurance prennums <br /> per year properties Appendix A <br /> 180 habitable Reduced cost of detention facility <br /> structures floodplain maintenance cost <br /> management <br /> Project constructed in Cost of mitigating <br /> one year flooding potential <br /> north of Town <br /> planning area <br />Preferred Alternative 50-year Design Life 180 existing One year of flood <br />Five - Undetained structures removed insurance <br />Diversion to from floodplain <br />Boxelder Creek <br /> 180 existing Increased property Project Costs <br /> structures values for existing identified on <br /> structures and homes spreadsheet in <br /> to be built on Appendix A <br /> developable land <br /> 900 developable Increase conveyance New bridges over <br /> acres also removed of Box elder Creek Boxelder Creek <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.