Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ASSUMPTIONS, BENEFITS AND COSTS <br />Table I <br /> <br />Alternative Assumptions Benefits Costs <br />One - No Action 50-year design life None Total cost of Flood <br /> Insurance, up to 2000 <br /> structures for 50 <br /> years <br /> 3 percent increase in Cost of floodplain <br /> insurance premiums management for <br /> per year Town <br /> 180 habitable Increased risk of <br /> structures major flooding <br />Two - Diversion to 50-year design life 180 structures One year of flood <br />Boxelder Creek removed from insurance, 180 <br /> floodplain structures <br /> 3 percent increase in Increased Property Project Costs, see <br /> insurance premiums Values, 180 private spreadsheet, <br /> per year properties Appendix A <br /> 180 habitable New bike trail and detention facility <br /> structures open space maintenance cost <br /> Project is constructed Increased conveyance New Boxelder <br /> m one year for Boxelder Creek bridges foster street <br /> widening (safety) <br /> Reduced Town effort Cost of mitigating <br /> for floodplain flooding potential <br /> management north of Town <br /> planning area <br /> New or rehabilitated <br /> bridges <br />Three - Diversion to 50-year design life 180 structures One year of flood <br />Windsor Canal removed from insurance, 180+/- <br /> floodplain structures <br /> <br />13 <br />