Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />transmission main to a 100,000 gallon tank which serves the Maloit Park Middle School. The <br />pumps are located within the disinfection building on top of the clearwell. The town's <br />distribution system includes a 12 inch primary main along Highway 24, with an 8 inch loop <br />through the town core area, and several 6 or 8 inch unlooped mains branching off of the <br />downtown loop, A pressure reducing valve (PRV) is located just upstream of the downtown <br />loop, and places the town core area and north Minturn into a lower pressure zone, Water <br />storage is provided by a 400,000 gallon uninsulated, steel tank located on the west side valley <br />slope above the town core. The tank is connected to the lower pressure zone loop by a 10 inch <br />wood stave supply main, <br /> <br />B. History <br /> <br />The modem, pressurized distribution system for Minturn was initially developed during the <br />1930's and 1940's with the installation of a wood stave pipe distribution system and transmission <br />main from a point of diversion on Cross Creek. Prior to that time, water was provided to the <br />town through the use of open ditches, initially from several intakes along the Eagle River, and <br />later from the Cross Creek diversion point. The town first began treating their municipal supply <br />in 1963, when two slow sand filters and a chlorine gas disinfection system were constructed <br />along Cross Creek above the existing point of diversion. A new raw water intake was built <br />above the treatment plant so that the system could continue to function by gravity flow only. <br /> <br />Beginning in the 1970's, the town began to replace the wood stave pipe with ductile-iron pipe. <br />Initial main replacement occurred from the 500 block of Main Street to the 500 block of Taylor <br />Avenue. An 8 inch transmission main, from the treatment plant clearwell to a new 100,000 <br />gallon storage tank at the middle school, was added in 1976, along with two small pumps at the <br />clearwell to boost water into the tank. In 1987 and 1988 replacement of 12 inch wood stave pipe <br />with 12 inch ductile iron pipe continued from the 500 block of Main to the 1800 block. In 1991, <br />the 6 inch wood stave loop along Toledo Avenue, Pine Street, Mann Avenue and Boulder Street <br />was replaced with 8 inch ductile iron pipe. Also, in 1991, a third slow sand filter was added to <br />the treatment works. The third filter is housed in a building to protect it from subfreezing <br />winter temperatures. <br /> <br />Today, wood stave pipe remains in the 1200 foot section along Highway 24 and the 6 inch wood <br />pipe along Eagle Street. Both segments are to be replaced as part of this project. The supply line <br />connecting the existing storage tank to the system is also wood stave construction. This pipe <br />will be abandoned after the new tank is brought into service. <br /> <br />The existing water tank was constructed in the mid 1940's and has served as a water storage <br />facility since that time, <br /> <br />Town of Minturn Water System Upgrade Project, March, 1995 <br /> <br />10 <br />