My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01996
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:36 AM
Creation date
7/3/2007 1:46:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0068FX
Contractor Name
Minturn, Town of
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The expected population, or population range, for those areas and the estimated time frame for <br />the development are shown in Table 3. <br /> <br />The water system upgrade project addressed in this report is primarily focused on addressing <br />existing system deficiencies, rather than facility expansion to accommodate all, or any, of the <br />growth indicated by the projections in Table 3, Projected growth data is included in this report <br />for informational purposes only, Development plans for each growth area shown in Figure 2 <br />must include provisions for securing their own 'water rights as required, as well as their own <br />system infrastructure, including tanks, distribution mains, and possibly additional water <br />treatment facilities, <br /> <br />Table 3 <br />Town of Minturn - Summary of Projected Population Growth <br /> <br />Growth Area <br /> <br />Estimated. Population <br /> <br />Period of Development <br />(year ) <br />2000 to 2010 <br />2005 to 2015 <br />1997 to 2007 <br />2005 to 2015 <br />2005 to 2020 <br /> <br />1 2,000-2,500 <br />2 1,500-2,000 <br />3 300 <br />4 500 <br />5 2,000 <br />Total 6,300( rnin) <br /> 7,300 (max) <br /> <br />Source: Planning Department, Town of Minturn <br /> <br />III. EXISTING FACILITIES <br /> <br />A. .Location/General <br /> <br />The water distribution system for the Town of Minturn is schematically shown in Figure 3. <br />Water is supplied by a surface water intake on Cross Creek which feeds raw water to the water <br />treatment plant through a 12 inch supply line. Water treatment consists of slow sand gravity <br />filtration with filtered water being delivered to a nearby clearwell. At the clearwell, filtered <br />water is both chlorinated and fluoridated. Soda ash is added for corrosion control. From the <br />clearwell treated water flows by gravity into the town's distribution system through a 4,700 foot, <br />12 inch transmission main. Water is separately delivered by two small pumps through an 8 inch <br /> <br />Town of Minturn Water System Upgrade Project, March, 1995 <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.