Laserfiche WebLink
<br />CWCB Construction Fund Loan Application <br />Revised January 31, 1994 <br /> <br />4. General location of the project. (please include county, and approximate distance and <br />direction from nearest town, as well as legal description, if known): <br />Eagle County one mile South of the Town of Minturn. See <br />Appendix 2 for legal description and plat map. <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, <br /> <br />need, facilities, types of water uses to be served and service area. (Attach separate sheet, <br />if needed.): See Appendix 3 - This question is covered in <br /> <br />more detail in the attached pre-feasibility study. <br /> <br />6. Will the acquisition of additional water rights be necessary? <br />YES NO~. If "YES", please explain: However, a pass-through <br />fish propagation water right will be purchased, at a nominal <br />cost, as part of the land procurement. <br /> <br />7. Please list the names and addresses of any technical or legal consultants retained to <br />represent the applicant or to conduct investigations for the proposed project:" <br />NAME ADDRESS and PHONE <br />Allen Christiansen 108 S. Frontage Rd. Vail, CO 81657 <br /> <br />8. List any feasibility studies or other investigations which have been completed or are now <br />in progress for the proposed project. (please s~bmit one copy of each completed study <br />with this application): <br />Pre-feasibility study completed by Town Manager, Richard <br />Dangler; PE #9493. <br /> <br />--- ". <br />--.... <br /> <br />......... 3 <br />