My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01989
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:36 AM
Creation date
7/3/2007 12:44:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0068FX
Contractor Name
Minturn, Town of
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br />Revised January 31, 1994 <br /> <br />4. Is the organization incorporated in the State of Colorado? YES ~ NO <br />(If "YES", please include a copy of the articles of incorporation, and the Bylaws with <br />this application form.) <br /> <br />5. Please provide a brief description of the owner's existing water supply facilities and <br />describe any existing operational or maintenance problems. (Attach separate sheets and <br />a map, if needed.): <br />System is composed of 3 slow sand filters with 1.25 MGD <br />capacity, 2 wells providing 160 gpm flow, 15 miles of 12" <br />distribution, a 400,000 gallon tank and a proposed 600,000 <br />storage tank. (See Appendix 1 for details) <br />6. For existing facilities indicate: (a) the number of shareholders N / A , or <br />(b) the number of customer<i served 594 Residential <br />60 Commercial <br /> <br />Part B. - Description of the Project <br /> <br />1. <br /> <br />Name of the project or facility: ._ Bol ts Lake proj ect <br /> <br />'" <br /> <br />Vlhat is the purpose of this loan application? Check one. <br /> <br />_ New project <br />2l Rehabilitation or replacement of existing facility <br />_ Enlargement of existing facility <br />_ Emergency Repair <br />_ Other (describe) <br /> <br />3. <br /> <br />If the project is for rehabilitation of an existing reservoir, is the reservoir currently under <br /> <br />a storage restriction order from the State Engineer? YES ~ NO _ <br />~..:~. (See attached state .Engineer .letter) <br /> <br />-..:..;;.. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.