My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01989
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:36 AM
Creation date
7/3/2007 12:44:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0068FX
Contractor Name
Minturn, Town of
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Appendix No.3 -- Response to Part S. Item 5 <br />CWCS Construction Fund Loan Application <br /> <br />Page 2 <br /> <br />affect upon maintenance of fish life in the Eagle River during these critical <br />stages. <br /> <br />C. Type of Water Uses to be Served: <br /> <br />Service is strictly tied to those services supplied by the Town of Minturn <br />water system. These services primarily are residential and commercial <br />connections using treated water. At the present time there is no agriculture or <br />other raw water uses. <br /> <br />Eventually, as part of a multi-purpose use, the lake will be used for fish <br />propagation in connection with a Town park and recreation project. Those <br />services will not be provided until the project enters into Phase II operations. <br /> <br />D. Service Area Description and Map <br /> <br />The Minturn Water System services the entire Town of Minturn. At this <br />time, there is no service outside of Town except for one house and the school <br />property at Maloit Park. This single family connection is part of an agreement to <br />service an individual handicapped from hazardous materials coming from the <br />Eagle Mine tailings. <br /> <br />The service area is show on Attachment No.2, a physiographic setting of <br />the present system. The location of the Bolts Lake project site is shown on this <br />map. <br /> <br />A water distribution system map is show as Attachment No.3. This map <br />shows the pressure zones that will be in effect after completion of the on-going <br />water system upgrade project. It also shows the location of the Bolts Lake <br />Project and the line that will tie into the existing system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.