Laserfiche WebLink
<br />TABLE 1 <br />COST ESTIMATE <br /> <br />RESERVOIR NO. S SPILLWAY <br /> <br />11117/97 <br /> <br /> UNIT <br />ITEM DESCRIPTION QUANTITY UNITS PRICE AMOUNT <br />1. Mobilization, Insurance, Bonds 1.00 L.S. 510,000.00 510,000 <br />2. Stripping 5.00 Acre 51,:500.00 57,500 <br />3. Excavation 4800.00 c.Y. 52.50 $12,000 <br />4. Fill 3000.00 C.Y. 53.00 59,000 <br />S. Spoil 1 SOO.OO C.Y. 51.00 51,500 <br />6. Riprap 1400.00 TONS $20.00 $28,000 <br />7. Riprap Bedding 550.00 TONS 515.00 $8.250 <br />8. Roadbase 260.00 TONS $15.00 $3.900 <br />9. Concrete Cutoff 90.00 C.Y. $2S0.00 522.500 <br />10. Seeding 5.00 Acres 52,000.00 510.000 <br /> <br />TOTAL cONsnmcnoN COST <br /> <br />$112.650 <br /> <br />TABLE 2 <br />COST ESTIMATE <br /> <br />INDIAN CREEK RESERVOIR SPILLWAY <br /> <br /> UNIT <br />ITEM DESCRlPTION QUANTIlY UNITS PRICE AMOUNT <br />l. Mobilization, Insurance, Bonds 1.00 L.S. 510,000.00 510,000 <br />2. Stripping 2.00 Acre 51,500.00 53,000 <br />3. Excavation 2500.00 C.Y. $2.50 56,250 <br />4. Pill 1000.00 C.Y. $3.00 53.000 <br />5. Spoil 0.00 C.Y. S 1.00 SO <br />6. Riprap 1400.00 TONS 520.00 $28.000 <br />7. Riprap Bedding 550.00 TONS $15.00 $8.250 <br />8. Roadbase 260.00 TONS $15.00 S3.900 <br />9. Concrete Cutoff 90.00 C.Y. 5250.00 522.500 <br />10. Seeding 2.00 Acres 52,000.00 $4.000 <br /> <br />TOTAL CONSTRUCTION COST <br /> <br />$88.900 <br /> <br />. " i~ ~:,"'.s:. \~ .' 1~f . , - - -~ - <br />