Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />FUND REQUIREMENT SCHEDULE <br /> <br />The New Cache La Poudre Irrigating Company is seeking funding through the <br />Colorado Water Conservation Board "Construction Fund' to finance $7.2 million <br />of the project. The NCLPIC will fund the remaining amount with a private loan, <br />their cash reserves, and through an increase in their assessments. <br /> <br />The expected fund requirement schedule for the project, with an estimated <br />project total cost of $9,542,000 is as shown below. The loan amount from the <br />CWCB will be $7.2 million and the portion from the NCLPIC will be $932,351. <br />The schedule of when the funds will be needed is based on design starting in <br />2004, construction starting in 2004 and being completed in 2008 in accordance <br />with the implementation schedule outlined above in Table 10. <br /> <br />The Fund Requirement Schedule shows the funds required by the NCLPIC and <br />the CWCB to complete the project. In 2004, funds will be required for <br />engineering, surveying, subsurface investigations, environmental assessment, <br />and land acquisition. In 2004 through 2006, funds will be required for <br />engineering, construction, and inspection. In 2007, funds will be required for <br />construction and inspection. From 2008 through 2012, the payment required <br />from the NCLPIC is the sum of the annual payments for the CWCB loan and the <br />Cornish Plains Loan. In 2013, the amount includes the CWCB annual payment <br />and the payoff amount for the Cornish Plains Loan. From 2013 through 2037, <br />the payment required from the CWCB is the annual payment for the CWCB <br />Loan. <br /> <br /> Total Funds Cornish Plains <br />Year Required CWCB Loan Livestock Loan NCLPIC Share <br />2003 $1,468,000 $0 $1,409,000 $59,000 <br />2004 $1,000,000 $850,000 $0 $150,000 <br />2005 $2,330,000 $1,990,000 $0 $340,000 <br />2006 $2,450,000 $2,100,000 $0 $350,000 <br />2007 $2,640,000 $2,260,000 $0 $380,000 <br />2008-2012 $467,000 $0 $0 $467,000 <br />2013 $1,310,000 $0 $0 $1,310,000 <br />2013-2037 $344,000 $0 $0 $344,000 <br />Totals $7,200,000 $13,400,000 <br /> <br />Table 16 - Fund Requirement Schedule <br /> <br />FINANCIAL ANALYSIS <br /> <br />The NCLPIC proposes to apply for a loan amount of $7.2 million from the <br />Colorado Water Conservation Board (CWCB) with a 30 year repayment period <br /> <br />New Cache Feasibility Study <br /> <br />37 <br />