My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150163 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150163 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:05:09 AM
Creation date
7/3/2007 8:36:52 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150163
Contractor Name
New Cache La Poudre Irrigating Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
04-1221
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />COST ESTIMATE <br /> <br />The cost estimate is for the layout and configuration presented in this report. <br />Dam embankment and storage volumes are based on Sarnesville and Cornish, <br />Colorado USGS topographic maps. Unit prices are based on 2003 prices <br />obtained from suppliers, contractors, and Smith Geotechnical project experience. <br />The cost estimate is in 2003 dollars and no adjustment has been done for <br />possible inflation. The total estimated project cost of approximately $9,542,000 <br />was broken into four segments as outlined below. <br /> <br />1. Drury Reservoir. <br />2. Cornish Plains Reservoir. <br />3. Sarnesville Reservoir including the ditch diversion structure. <br />4. Pipeline and Jack Wells Pumping Station. <br /> <br />The cost estimate is summarized in Tables 11-15. <br /> <br />Item <br />Drury Reservoir <br />Cornish Plains Reservoir <br />Barnesville Reservoir <br />Jack Wells Pumping Station and Pipeline <br />Property Acquisition <br />Total Project Cost <br /> <br />Table 11 - Cost Estimate Summary <br />Cost <br />$2,217,000 <br />$2,350,000 <br />$922,000 <br />$1,632,000 <br />$2,421,000 <br />$9,542,000 <br /> <br />New Cache Feasibility Study <br /> <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.