My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150163 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150163 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:05:09 AM
Creation date
7/3/2007 8:36:52 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150163
Contractor Name
New Cache La Poudre Irrigating Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
04-1221
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />A visual inspection for environmental issues was conducted on the site. Most of <br />the site is currently used for agriculture and there is no indication of prairie dog or <br />burrowing owl activity on site. The site does not fall on the Preble's Meadow <br />Jumping Mouse Critical Habitat Map, however, the low area at the proposed <br />Barnesville Equalizer site may be potential habitat and should be evaluated by a <br />qualified environmental expert early in the design phase to determine if trapping <br />studies or other measures are necessary. <br /> <br />Based on the current scope of work, the reservoir development would not require <br />an Army Corps of Engineers 404 Permit. A copy of the Corps of Engineers <br />jurisdictional determination letter is contained in Appendix E. <br /> <br />IMPLEMENTATION SCHEDULE <br /> <br />The NCLPIC plans to conduct construction in phases starting with the Barnesville <br />Equalizer. A proposed implementation schedule is in Table 10. <br /> <br /> <br />Table 10 -Implementation Schedule <br />Date Com lete <br />November, 2003 <br />January, 2004 <br /> <br />December, 2003 <br />Ma ,2004 <br />Februa ,2005 <br />November, 2004 <br />Jul ,2005 <br />Februa ,2006 <br />A ril, 2005 <br />March, 2006 <br />Jul ,2006 <br />March, 2007 <br />March,2007 <br />March,2008 <br /> <br />INSTITUTIONAL CONSIDERATIONS <br /> <br />Entities that are or may be involved in assessment, design, and construction of <br />the project are listed below. <br /> <br />New Cache La Poudre Irrigating Company - Owner. <br />Smith Geotechnical Engineering Consultants - Civil engineer, dam design, construction engineer. <br />HRS Water Consultants, Inc. - Water rights and groundwater engineer. <br />Aqua Engineering, Inc. - Irrigation Engineering including SCADA instrumentation and monitoring. <br />Bill Brown - Attorney <br />Colorado Water Conservation Board (CWCB) - Financing and construction. <br />Weld County - Development review and approval. <br /> <br />New Cache Feasibility Study <br /> <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.